The Trans/Caspian gas pipeline would run under the Caspian Sea from Türkmenbaşy to the Sangachal Terminal, where it would connect with the existing pipeline to Erzurum in Turkey, which in turn would be connected to the Southern Gas Corridor, thus taking natural gas from Turkmenistan to Central Europe.
The Trans/Caspian gas pipeline would run under the Caspian Sea from Türkmenbaşy to the Sangachal Terminal, where it would connect with the existing pipeline to Erzurum in Turkey, which in turn would be connected to the Southern Gas Corridor, thus taking natural gas from Turkmenistan to Central Europe.
Location
Country Turkmenistan
Azerbaijan
General direction East–west
From Türkmenbaşy
Passes through Caspian Sea
To Sangachal Terminal, Baku
Technical information
Maximum discharge 30 billion cubic metres (1.1 trillion cubic feet)

The Trans-Caspian Gas Pipeline (Azerbaijani: Transxəzər boru xətti, Turkmen: Transhazar turbaly geçiriji) is a proposed subsea pipeline between Türkmenbaşy in Turkmenistan, and Baku in Azerbaijan. According to some proposals it will also include a connection between the Tengiz Field in Kazakhstan, and Türkmenbaşy. The Trans-Caspian Gas Pipeline project is purposed to transport natural gas from Turkmenistan and Kazakhstan to European Union member countries, circumventing both Russia and Iran. It is also considered as a natural eastward extension of Southern Gas Corridor. This project attracts significant interest since it will connect vast Turkmen gas resources to major consumer geographies as Turkey and Europe.

A project to import natural gas from Turkmenistan through a subsea pipeline was suggested in 1996 by the United States. In February 1999, the Turkmen government entered into an agreement with General Electric and Bechtel Group for a feasibility study on the proposed pipeline. In 1999, while attending the Organization for Economic Co-operation and Development meeting in Istanbul, Turkey, Georgia, Azerbaijan and Turkmenistan signed a number of agreements concerned with construction of pipelines. However, because of Russian and Iranian opposition to the project, an unresolved legal dispute over Caspian Sea territorial boundaries and a gas discovery on Azerbaijan's Shah Deniz field, the submarine pipeline project was shelved in the summer of 2000 and only the South Caucasus Pipeline project continued.


...