Tai Seng Facility Building

Tai Seng Facility Building
Location
Location 101 Bartley Road East, Singapore 533951
Coordinates 1°20′32.15″N 103°53′43.26″E / 1.3422639°N 103.8953500°E / 1.3422639; 103.8953500
Characteristics
Operator(s) SBS Transit DTL
Roads Bartley Road East
Rolling stock C951/C951A
Routes served Downtown Line
History
Opened 2017

Tai Seng Facility Building, abbreviated as TSFB, (or Tai Seng) is an upcoming underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance, stabling and operational facilities for the Downtown Line. It is located in Hougang along Bartley Road East. It is accessible via a surface building located along Bartley Road East.

The depot is approximately 52 metres wide, 295 metres long and 20 metres deep. It is connected to Kim Chuan Depot and has underground access for trains to run between both facilities, allowing Downtown Line trains to be stabled in the Tai Seng Facility Building, and able to access its remote tracks. It will be used in tandem with Kim Chuan Depot when stage 3 of the Downtown Line become operational.

Construction of the Tai Seng Facility Building began in November 2010 and was targeted for completion in March 2013, ahead of the commencement of service along the Downtown Line Stage 1. The rolling stock for the line were stabled at the neighbouring Kim Chuan Depot, which houses the trains for the Circle Line. However, the reception tracks at the east of the facility, which will connect the facility to the stage 3 of the Downtown Line which opens in 2017, will not be ready until 2015 as tunnelling is still in progress, and construction work of the remaining of the line is still in progress.

When Stage 1 of the Downtown Line opened in late 2013, Kim Chuan Depot was used for maintenance and launching of rolling stock for the Downtown Line, until Stage 2 was completed in 2015, providing access to Gali Batu Depot, the Downtown Line's main depot. During this time, Downtown Line trains had to be towed from the facility via Circle Line tracks overnight to Stage 1 of the Downtown Line for revenue service and light maintenance work was done at the temporary Marina Bay Maintenance Facility.

The depot will be used at full capacity for the housing and maintenance of trains when Stage 3 of the Downtown Line opens in late 2017. This will also include a direct connection between the line directly to the facility between Ubi station and Bedok North station via two reception tracks: 1 track Bukit Panjang-Bound towards Ubi station and 1 track Expo-bound towards Bedok North Station.


...