*** Welcome to piglix ***

Bombardier Movia & CNR Changchun C951

Changchun Bombardier Movia C951
Bombardier MOVIA C951.jpg
A C951 train.
Interior view in C951 train.jpg
Interior view in the front driving car in C951 train.
Bombardier MOVIA C951 interior.jpg
Interior view in the motor car in C951 train.
In service 22 December 2013–current
Manufacturer Changchun Bombardier Railway Vehicles
(Bombardier Transportation and CNR Changchun)
Built at Changchun, China
Family name Movia
Constructed 2012 - 2016
Entered service 2013–
Number built 276 vehicles (92 sets)
Number in service 135 vehicles (45 sets)
Formation 3 per trainset
Mc1-T-Mc2
Fleet numbers 9001 ~ 9092
Capacity 931 Passengers
Operator(s) SBS Transit
Depot(s) Gali Batu, Kim Chuan, Tai Seng and East Coast(future)
Line(s) served Downtown Line
Specifications
Car body construction Welded aluminium
Train length 70.1 m (229 ft 11 78 in)
Car length 23.37 m (76 ft 8 18 in)
Width 3.2 m (10 ft 6 in)
Height 3.68 m (12 ft 78 in)
Doors 1,450 mm (57 116 in), 8 per car
Maximum speed 90 km/h (56 mph) (Design)
80 km/h (50 mph) (Service)
Weight 38.3 t (37.7 long tons; 42.2 short tons) per car
Traction system IGBTVVVF
(Bombardier MITRAC 1000)
Traction motors Totally enclosed fan cooled Permanent Magnet Synchronous Motor (Bombardier DR1200)
Acceleration 1.1 m/s2 (3.6 ft/s2)
Deceleration 1.1 m/s2 (3.6 ft/s2) (Normal Braking)
1.4 m/s2 (4.6 ft/s2) (Emergency Braking)
Electric system(s) 750 V DC third rail
Current collection method Collector shoe
Braking system(s) Regenerative Braking, Resistor Braking, Air Brakes
(by Knorr Bremse Germany)
Safety system(s) Siemens Trainguard Sirius Moving Block CBTC ATC with subsystems of ATO GOA 4 (UTO), ATP, Controlguide Rail 9000 ATS, Trackguard Westrace MK2 CBI
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Changchun Bombardier Movia C951 is a type of train built for Singapore's Downtown Line. The contract was won by Bombardier Transportation and the rolling stock was built by Changchun Bombardier Railway Vehicles (joint venture of Bombardier Transportation and CNR Changchun) Initially, the authorities has ordered 73 trains, although LTA had ordered an additional 15 trains and a final 4 more trains under C951A which makes a total of 92 trainsets were manufactured under C951.

The tender for trains under the contract turnkey 951 was closed on June 2008. The tender results was published on Nov 2008, with the winner in bold.

73 trainsets consisting of three cars each were purchased at a cost of approximately S$570.7 million for passenger service.Bombardier beat Alstom, Kawasaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.

Land Transport Authority later placed an additional order of 15 trainsets in 2013 at an approximate value of $119.2 million. LTA had increased the variation order from 15 to 19, therefore bringing the total trainsets to 92. A partial number of the total fleet operates on the Stage 1 of Downtown Line since 22 December 2013. All 92 trains had completed their manufacturing in Changchun Bombardier Railway Vehicles factory, with some of them awaiting for their delivery into Singapore by mid-2017.

These trains are being delivered until 2017. They will be stabled at Gali Batu Depot, Kim Chuan Depot, Tai Seng Facility Building and the future East Coast Integrated Depot.


...
Wikipedia

...