*** Welcome to piglix ***

Downtown MRT Line

 DTL 
Downtown MRT Line
Laluan MRT Pusat Bandar
滨海市区地铁线
டவுன்டவுன் எம்ஆர்டி வழி
MRT map DT.svg
The Downtown Line is coloured blue on system maps.
Overview
Type Rapid transit
System Mass Rapid Transit (Singapore)
Status Operational (Stages 1 & 2)
Under testing (Stage 3)
Under construction (DTL3e)
Termini Bukit Panjang
Chinatown
Expo (2017)
Sungei Bedok (2024)
Stations 18 (Operational)
16 (Under Testing)
2 (Under Construction)
Services 1
Daily ridership 234,000 (Q3 2016)
Operation
Opened 22 December 2013 (Stage 1)
27 December 2015 (Stage 2)
End-2017 (Stage 3)
2024 (Stage 3e)
Owner Land Transport Authority
Operator(s) SBS Transit DTL
(ComfortDelGro Corporation)
Character Underground
Depot(s) Gali Batu
Kim Chuan
Tai Seng
East Coast (Future)
Rolling stock C951
Technical
Line length 20.9 km (13.0 mi) (operational)
23.2 km (14.4 mi) (U/C)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC Third rail
Operating speed limit of 80 km/h
Route map
Gali Batu Depot
 DT1  BP6  Bukit Panjang
Left arrow  Choa Chu Kang – Via Senja/Petir Right arrow
 DT2  Cashew
 DT3  Hillview
 DT5  Beauty World
Pan Island Expressway
 DT6  King Albert Park
Bt Timah Canal
 DT7  Sixth Avenue
 DT8  Tan Kah Kee
Farrer Road
Left arrow  HarbourFront – Bishan Right arrow
 DT9  CC19  Botanic Gardens
Left arrow  Sungei Bedok – Woodlands North Right arrow
 DT10  TE11  Stevens
 DT11  NS21  Newton
Left arrow  Marina South Pier – Jurong East Right arrow
Central Expressway
Wikipedia

...