*** Welcome to piglix ***

Circle MRT Line

MRT Singapore Destination 8.png MRT Singapore Destination 9.png MRT Singapore Destination 10.png
 CCL 
Circle MRT Line
Laluan MRT Bulatan
地铁环线
இணைப்பு எம்ஆர்டி வழி
MRT map CC.svg
The Circle Line is coloured orange on system maps.
Overview
Type Rapid transit
System Mass Rapid Transit (Singapore)
Status Operational
Under planning (Stage 6)
Termini Dhoby Ghaut
HarbourFront
Marina Bay
Stations 33 (excluding Bukit Brown)
Services 3
Daily ridership 398,000 (May 2015)
Operation
Opened 28 May 2009 (Stage 3)
17 April 2010 (Stage 1 and 2)
8 October 2011 (Stage 4 and 5)
14 January 2012 (Circle Line Extension)
2025 (Stage 6)
Owner Land Transport Authority
Operator(s) SMRT Trains (SMRT Corporation)
Character Underground
Depot(s) Kim Chuan
Rolling stock C830, C830C
Technical
Line length 35.5 km (22.1 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC third rail
Operating speed limit of 78 kilometres per hour (48 mph)
Route map
Left arrow Jurong East
 
Left arrow HarbourFront
  Punggol Right arrow
 CC1  NS24  NE6  Dhoby Ghaut
 
  Chinatown Right arrow
 CC2  Bras Basah
 CC3  Esplanade
 CE2  NS27  TE20  Marina Bay
Left arrow Marina South Pier
 
 CE1  DT16  Bayfront
 CC4  DT15 <...
Wikipedia

...