CC4 DT15
Promenade 宝门廊 புரொமனாட் Promenade |
|||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||||||||||||
Dhoby Ghaut/Marina Bay-bound platform level of Promenade MRT station.
|
|||||||||||||||||||||
Location | 2 Temasek Avenue 10 Temasek Avenue Singapore 039193/ 039194 |
||||||||||||||||||||
Coordinates | 1°17′35″N 103°51′40″E / 1.293131°N 103.861064°E | ||||||||||||||||||||
Operated by |
SMRT Trains (SMRT Corporation) (Circle Line) SBS Transit DTL (Downtown Line) |
||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms | Stacked side | ||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||
Connections | Bus, Taxi | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
Depth | 43 metres | ||||||||||||||||||||
Platform levels | 7 | ||||||||||||||||||||
Parking | Yes | ||||||||||||||||||||
Bicycle facilities | Yes | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | CC4 DT15 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 17 April 2010 (Circle Line) 14 January 2012 (Circle Line Extension) 22 December 2013 (Downtown Line) |
||||||||||||||||||||
Electrified | Yes | ||||||||||||||||||||
Previous names | Millenia | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
|||||||||||||||||||||
Location | |||||||||||||||||||||
Promenade MRT Station (CC4/DT15) is an underground Mass Rapid Transit interchange station in Downtown Core, Singapore, located along Temasek Avenue near the Millennia Walk shopping mall.
It is the fourth station along the counter-clockwise-bound Circle Line track. The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line. On 14 January 2012, Circle Line Extension was opened and this station became an interchange for the extension. On 22 December 2013, this station became an interchange with the Downtown Line. Passengers heading to Bayfront or Marina Bay should head to Circle Line's Platform B (towards Dhoby Ghaut or Marina Bay). An announcement will be made, notifying commuters when the train going towards Marina Bay arrives. Passengers heading to Bayfront also have the additional option of taking the Downtown Line here.
The Circle Line branches out to 2 routes at this station. The first route goes to the Downtown Core southwest of the Singapore River towards Marina Bay via Bayfront with an extension towards HarbourFront to complete the circle in 2025. The second route is currently the main route, and goes to stations in the part of the Downtown Core northeast of the Singapore River (Dhoby Ghaut, Bras Basah and Esplanade).
With the construction of the Downtown Line platforms below the Circle Line platforms, this station is currently the deepest station in the entire Mass Rapid Transit network. Its deepest platform is located at Basement 7, where the Downtown MRT Line side platform with trains bound for Bukit Panjang sits, with a depth of 43 meters below ground.