New Pantai Expressway

Mes-e10.png

Expressway 10
New Pantai Expressway
Route information
Maintained by New Pantai Expressway Sdn Bhd (NPE)
Length: 19.6 km (12.2 mi)
Main link: 14.0 km (8.7 mi)
Salak link: 5.6 km (3.5 mi)
Existed: 2000 – present
History: Completed in 2004
Major junctions
West end: Subang Jaya, Selangor
  Persiaran Tujuan
Persiaran Kewajipan
E11Damansara-Puchong Expressway
2Federal Highway
2Jalan Klang Lama
Jalan Kuchai Lama
E37Kuala Lumpur-Seremban Expressway
E20Maju Expressway
Jalan Bangsar
North end: Bangsar, Kuala Lumpur
Location
Primary
destinations:
USJ, Subang Jaya, Bandar Sunway, Petaling Jaya, Kuchai Lama, Pantai Dalam, Pantai Bahru, Bangsar, KL Sentral, Kuala Lumpur
Highway system

Mes-e10.png

New Pantai Expressway, (NPE) E10 (Malay: Lebuhraya Baru Pantai), is a major expressway in the Klang Valley region of Malaysia. The 19.6 km (12.2 mi) expressway has provided an easier access to Kuala Lumpur from Subang Jaya and Bandar Sunway to avoid the traffic jams on the Federal Highway Route 2 during rush hour. It comprises the Main Link and the Salak Link.

The Kilometre Zero is located at Jengka Interchange in Subang Jaya, Selangor.

The expressway was known as Jalan Subang Utama (Persiaran Tujuan - PJS), Jalan Klang Lama 2 (Federal Highway - Jalan Templer side) and Jalan Pantai Dalam (Jalan Bangsar - Kampung Pantai Dalam side). The project was awarded to Maxtro Engineering Sdn Bhd, a subsidiary of Berjaya Group but it was handed over to the new concessionaire, New Pantai Expressway Sdn Bhd, a subsidiary of IJM Corporation Berhad in 2002.

It was constructed between 2000 and 2004. Construction of the expressways was led by Road Builder (M) Holdings Berhad (RBH) which in 2007 was acquired by IJM Corporation Berhad. Phase 1, which is between Jengka roundabout and Bandar Sunway was completed in 2002. The next sections from Bandar Sunway to Pantai Baharu (Phase 2) and Pantai to Salak South (Phase 3: Salak Link) were completed in 2003. During construction, the concessionaire temporarily relocated 2,000 squatters in Pantai Dalam while building them 980 low-cost apartments close to their settlement. The expressway was officially opened on 30 April 2004.

Tujuan Interchange which replaced a T-junction was constructed between 2004 and 2006. The Bulatan Gasing ramp from NPE to Jalan Gasing was also constructed between 2004 and 2006. A special ramp to Sunway Pyramid's parking floor was constructed between January and November 2007. It was opened in December 2007.


...