*** Welcome to piglix ***

Kuala Lumpur-Rawang Highway

Jkr-ft1.png

Part of Federal Route 1
Kuala Lumpur Rawang Highway
Route information
Existed: 1985 – present
History: Completed in 1987
Major junctions
North end: Rawang, Selangor
  Jkr-ft3209.png Jkr-ft--.png Jalan Kawasan Perindustrian Rawang
E25Kuala Lumpur-Kuala Selangor Expressway
Rawang Bypass
Jkr-ft--.png Kepong-Selayang Highway
Jkr-ft28.png Kuala Lumpur Middle Ring Road 2
Jkr-ft54.png Federal Route 54
Jalan Ipoh
E33 Duta-Ulu Klang Expressway
Jalan Tuanku Abdul Halim (Jalan Duta)
Kuala Lumpur Middle Ring Road 1
South end: Jalan Sultan Ismail, Kuala Lumpur
Location
Primary
destinations:
Ipoh
Bandar Baru Selayang
Selayang
Batu Caves
Kepong
Segambut
Highway system

Jkr-ft1.png

Kuala Lumpur Rawang Highway, Federal route 1 also known as Jalan Kuching and Jalan Ipoh, is a major highway in Klang Valley region, Malaysia.

The most controversial development of the FT1 highway in Kuala Lumpur was the toll collection at Jalan Kuching FT1. The nine-year concession of Jalan Kuching FT1 was awarded to Kamunting Corporation Berhad, signed on 15 April 1985. In the original concessionaire agreement, Kamunting Corporation Berhad was required to build an interchange at Kepong Roundabout and to upgrade the Jalan Kepong FT54, in return for the nine-year toll collection rights starting from 1987 until 1996. However, in 1987, the concessionaire agreement was amended, and Kamunting Corporation Berhad was required to add two more lanes from the existing four lanes along Jalan Kuching FT1, resulting another 7-year extension of toll concession which was ended in 2003. The toll collection at Jalan Kuching FT1 had sparked fury among Kuala Lumpurian motorists, and numerous protests were held to urge the government to end the toll collection there. The toll collection at Jalan Kuching FT1 was finally abolished on 8 January 2003.

The Segambut roundabout was upgraded into four-level interchange. Construction began in 2004 and was completed by the end of 2006. The project was led by Malaysian Public Works Department (JKR), Kuala Lumpur City Hall (DBKL) and the main contractor was Ahmad Zaki Resources Berhad (AZRB). This four-level interchange was opened to traffic on 26 February 2007.

The 2-lane single-carriageway section between Bandar Baru Selayang and Templer's Park was upgraded to 4-lane dual-carriageway with emergency lanes and several U-turns. Construction started in 2006 and was expected to be completed in 2009.


...
Wikipedia

...