*** Welcome to piglix ***

KL Monorail

KL Monorail Line
Rapid KL Logo.svg
160316 KL Monorail leaving Raja Chulan station.jpeg
4-car Scomi SUTRA at MR7 Raja Chulan
Overview
Native name Laluan Monorel KL
Type Straddle-beam Monorail
System People-mover Rapid Transit (PRT) - SelTrac CBTC
Status Operational
Locale Kuala Lumpur
Termini KL Sentral Monorail Terminal
Titiwangsa
Stations 11
Services KL Sentral-Titiwangsa
Daily ridership 68,679 (2015)
Ridership 25.067 million (2015)
(Increase 3.1%)
Line number  8  (yellow-green)
Website http://www.myrapid.com.my/
Operation
Opened 31 August 2003
Owner Prasarana Malaysia
Operator(s) Rapid Rail
Character Elevated
Depot(s) Brickfields
Rolling stock Scomi SUTRA four-car trains
Scomi/MTrans two-car trains
Technical
Line length 8.6 km (5.3 mi)
Operating speed 60 km/h (37 mph)
Route map
Greater KL / Klang Valley Integrated Transit Map
Source: SPAD as at September 2016

Interchange station

The KL Monorail Line is the eighth rail transit line and the only operational monorail system in Malaysia. It is part of the Greater KL/Klang Valley Integrated Transit System under the Land Public Transport Commission of Malaysia (SPAD). The line is numbered 8 and coloured yellow-green on transit map.

The monorail line was opened on 31 August 2003, with 11 stations running 8.6 km (5 mi) on two parallel elevated tracks. It connects the KL Sentral Monorail Terminal at KL Sentral with the "Golden Triangle". It was completed at a cost of MYR 1.18 billion by the KL Infrastructure Group (KL Infra).

The monorail scheme was announced by Kuala Lumpur City Hall in January 1990 after the Malaysian Government gave the go-ahead to the scheme at a cabinet meeting in June 1989. Its cost was then estimated at RM 143 million. The 14-km, 22-station system is designed to carry more than 34,000 passengers a day on a 20-minute loop through Kuala Lumpur's bustling commercial core. The plan is to build it in two phases: in the first, 16 stations will be serviced over 7.7 km; and in the later stage, another 6.5-km loop will be added. The first phase was expected to be completed within two years.

Plans dating back to the 1990s envisioned the Monorail to go all the way to Mid Valley, Abdullah Hukum and Taman OUG.

Work was scheduled to begin in June 1990, but was postponed to May 1991, after the city's mayor complained that tenders submitted for preparatory work were too high. There has been no activity on the project since and few details are available on how the project is expected to proceed. The main contractor is a local company, BNK, which had little success in its search for backers to finance its share of the venture. Part of its problem in securing money stems from the project's escalating cost estimates, and part from its lack of a track record in handling such huge projects.


...
Wikipedia

...