*** Welcome to piglix ***

Ingolstadt–Treuchtlingen railway

Ingolstadt Hbf–Treuchtlingen railway
Dollnstein Hp.jpg
Overview
Native name Bahnstrecke Ingolstadt Hbf–Treuchtlingen
Type Heavy rail, Passenger/freight rail
Regional rail, Intercity rail
Status Operational
Termini Ingolstadt Hbf.
Treuchtlingen
Stations 11
Line number 5501
Operation
Opened 12 April 1870
Owner Deutsche Bahn
Operator(s) DB Bahn
Technical
Line length 55.8 km (34.7 mi)
Number of tracks Double track (Ingolstadt–Treuchtlingen)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 15 kV 16.7 Hz AC Overhead line
Operating speed 160 km/h (99 mph)
Route number 990
Route map
From Munich (Munich–Ingolstadt)
From Augsburg (Paar Valley Railway)
From Neuoffingen (Danube Valley Railway, since 1994)
From Regensburg (Danube Valley Railway )
81.0 Ingolstadt 368 m
To Neuoffingen (Danube Valley Railway, until 1994)
B 13
83.2 Danube (Ingolstadt rail bridge, 184 m)
B 13
84.3 Ingolstadt Nord
to Esso works station and to Riedenburg (closed)
84.3 To Nuremberg (Ingolstadt–Nürnberg)
87.9 Ingolstadt Nord yard(to Ingolstadt freight centre)
90.0 Gaimersheim 387 m
B 13 bridge
94.2 Eitensheim
97.5 Tauberfeld 421 m
102.9 Adelschlag
107.3 Gravel works siding
107.7 Eichstätt Bahnhof (station) 425 m
To Eichstätt town (Eichstätt–Beilngries)
111.1 Obereichstätt
118.0 Dollnstein 401 m
To Rennertshofen (Dollnstein–Rennertshofen)
Altmühl
Esslingerberg crossover(switchable)
121.3 Esslingerberg Tunnel (633 m)
Altmühl
125.1 Solnhofen 408 m
Altmühl
Altmühl
128.9 Kirchberg Tunnel (108 m)
129.4 Plastal siding
130.3 Pappenheim
Altmühl
Altmühl
B 2
From Augsburg (Nuremberg–Augsburg)
136.8 Treuchtlingen 420 m
To Würzburg Hbf (Treuchtlingen–Würzburg)
Wikipedia

...