*** Welcome to piglix ***

Nuremberg–Munich high-speed railway

Nuremberg–Munich high-speed railway
SFS Nuernberg-Muenchen.png
Overview
Native name Schnellfahrstrecke Nürnberg–Ingolstadt–München
Locale Bavaria
Line number New line: 5934; Old line: 5501
Technical
Line length 170.8 km
Track gauge 1,435 mm (4 ft 8 12 in)
Minimum radius 300 km/h section: 4085 m
Upgraded track: 814 m
Operating speed 300 km/h, upgraded track: 200 km/h
Maximum incline 300 km/h section: 20 (300 km/h section)
Upgraded track: 12.5
Route map
 Operating points and lines 
100.6 Nuremberg Hauptbahnhof
see Nuremberg–Regensburg railway
from Nuremberg marshalling yard
91.0
9.6
Nürnberg Reichswald junction
Nuremberg–Regensburg line
9.8 Beginning of new line
10.6 A6
11.2 to Regensburg
15.0 Schwarzach viaduct (104 m)
15.5 A73 (Nürnberg/Feucht interchange)
25.4 Allersberg (Rothsee)
29.0 Göggelsbuch tunnel (2287 m)
33.6 Main-Danube Canal (141 m)
40.5 Offenbau tunnel (1333 m)
42.4 Lohen signal box
47.2 Staatsstraße 2227 near Großhöbing (305 m)
49.1 Euerwang tunnel (7700 m)
57.7 Anlauter
57.8 Schellenberg tunnel (650 m)
58.6 Kinding (Altmühltal)
59.4 Altmühl (79 m)
59.6 Irlahüll tunnel (7260 m)
67.6 Denkendorf tunnel (1925 m)
76.0 Stammham tunnel (1320 m)
78.1 Geisberg tunnel (3289 m)
85.0 Audi Tunnel (1258 m)
86.8 Ingolstadt NordEnd of new line
87.0
84.3
interweaving of Treuchtlingen–Munich line
(3 tracks)
84.3 from Treuchtlingen
83.4 Ingolstadt railway bridge over the Danube (184 m)
81.0 Ingolstadt Hauptbahnhof

Beginning of upgraded line
78.4 Paar Valley Railway (track towards Ingolstadt)
77.1 Oberstimm
74.4 Ebenhausen factory siding
72.4 Reichertshofen (Oberbayern)
71.0 Paar
67.8 A9
66.4 Hög

...