Future MTR rapid transit station | ||||||||||||||||||||||||||
Construction in February 2016
|
||||||||||||||||||||||||||
Chinese name | ||||||||||||||||||||||||||
Traditional Chinese | 會展 | |||||||||||||||||||||||||
Simplified Chinese | 会展 | |||||||||||||||||||||||||
|
||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||
Location | Intersection of Fleming Road and Convention Avenue, Wan Chai Wan Chai District, Hong Kong |
|||||||||||||||||||||||||
Coordinates | 22°16′54″N 114°10′31″E / 22.2818°N 114.1754°ECoordinates: 22°16′54″N 114°10′31″E / 22.2818°N 114.1754°E | |||||||||||||||||||||||||
Owned by | KCR Corporation (North South Corridor); MTR Corporation (Tseung Kwan O Line) | |||||||||||||||||||||||||
Operated by | MTR Corporation | |||||||||||||||||||||||||
Line(s) | ||||||||||||||||||||||||||
Platforms | 2 (2 side platforms) | |||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||
Station code | EXH | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opening |
|
|||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
|
||||||||||||||||||||||||||
Location | ||||||||||||||||||||||||||
Location within the MTR system
|
Transcriptions | |
---|---|
Standard Mandarin | |
Hanyu Pinyin | Huìzhǎn |
Yue: Cantonese | |
Yale Romanization | wui5 jin2 |
Jyutping | wui5 zin2 |
Exhibition (Chinese: 會展) is an MTR interchange station under construction on the proposed North Island Line and the North South Corridor. It will be an underground station located underneath the existing Wan Chai North public transport interchange, Harbour Road Sports Centre and Wan Chai Swimming Pool. It will serve the Hong Kong Convention and Exhibition Centre at Wan Chai North, Hong Kong Island, Hong Kong. The station will be completed in 2020 or 2021.
The station serves the Hong Kong Convention and Exhibition Centre, the Wan Chai Sports Ground, and various nearby office towers in Wan Chai North.
It will be an interchange between the North Island Line (the extension of Tseung Kwan O Line) and the North South Corridor of the Sha Tin-Central Link, offering cross-platform interchange between the two lines. Yet, only North South Corridor platform will be open in service first, as the North Island Line will be still under planning.
The station is being designed by Farrells. In January 2015, MTR awarded a contract to Leighton in joint venture with China State Construction to construct the station and western approach tunnel. The Wan Chai Bus Terminus, where the station will be built, was relocated to newly reclaimed land and the station groundbreaking took place on the former bus station site on 20 April 2015.
The station will be built on the site of the existing Harbour Road Sports Centre, Wan Chai Swimming Pool, and a bus terminus, which must all be demolished and reprovisioned elsewhere before construction shall begin. The swimming pool and sports centre are being rebuilt on the car park site immediately to the south. The bus terminus has temporarily relocated to the reclamation area near the new Wan Chai Ferry Pier.