Ampang-Kuala Lumpur Elevated Highway

Mes-e12.png

Expressway 12
Ampang–Kuala Lumpur Elevated Highway
(AKLEH)
Route information
Maintained by Prolintas
Length: 7.7 km (4.8 mi)
Existed: 1996 – present
History: Completed in 2000, opened in 2001
Major junctions
West end: Jalan Sultan Ismail, Kuala Lumpur
  Kuala Lumpur Middle Ring Road 1
28Kuala Lumpur Middle Ring Road 2
Jkr-ft--.png Jalan Kerja Ayer Lama
Jkr-ft--.png Jalan Ampang
East end: Jalan Memanda, Ampang, Selangor
Location
Primary
destinations:
Jalan Sultan Ismail
Jalan Tun Razak
Ulu Klang
Ampang
Highway system

Mes-e12.png

Ampang–Kuala Lumpur Elevated Highway (AKLEH), E12 (Malay: Lebuhraya Bertingkat Ampang–Kuala Lumpur), is the first elevated highway in Malaysia. The 7.7 km (4.8 mi) elevated highway connects Ampang (Selangor) and Kuala Lumpur. This highway was built to reduce traffic jams at Jalan Ampang and make access to the city more convenient. Motorcycles and other vehicles with two wheels or fewer were banned from using this highway for safety reasons; however, the ban on motorcycles was lifted on 19 June 2008 because of escalating fuel prices. This highway connects Kuala Lumpur and Selangor state.

The Kilometre Zero is located at Jalan Sultan Ismail Interchange, Kuala Lumpur.

The construction of the Ampang–Kuala Lumpur Elevated Highway was approved on 16 May 1996 when Prolintas was awarded the concession of the highway which will end in 2029. Construction began in the same year at the banks of Klang River and was completed in 2001. The highway was opened to traffic on 17 May 2001 after numerous delays, and the toll collection started on 1 June 2001.

The highway was designed to accommodate future expansion of the Jelatek-Kuala Lumpur Middle Ring Road 2 section from the current four-lane carriageway to six-lane carriageways. The expansion will take place along the northern bank of the Klang River and Ampang River. According to the concessionaire agreement between Prolintas and the federal government, Prolintas is required to expand the highway once the average daily traffic exceeds 93,000 vehicles daily. As a result, a chicane was formed right after the Exit 1203 Jelatek Interchange for Ampang-bound traffic. Prolintas will only be allowed to raise the toll rate once the upgrading works of the Jelatek-MRR2 section to six-lane carriageway begins.


...