Sunbury
|
|||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Northbound view from Platform 1 in November 2012
|
|||||||||||||||||||||
Location | Brook Street, Sunbury Australia |
||||||||||||||||||||
Coordinates | 37°34′45″S 144°43′40″E / 37.5792°S 144.7279°ECoordinates: 37°34′45″S 144°43′40″E / 37.5792°S 144.7279°E | ||||||||||||||||||||
Owned by | VicTrack | ||||||||||||||||||||
Operated by | Metro | ||||||||||||||||||||
Line(s) |
Bendigo Sunbury |
||||||||||||||||||||
Distance | 38.28 kilometres from Southern Cross | ||||||||||||||||||||
Platforms | 2 side | ||||||||||||||||||||
Tracks | 3 | ||||||||||||||||||||
Connections | Bus | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Ground | ||||||||||||||||||||
Parking | 300+ | ||||||||||||||||||||
Bicycle facilities | Yes | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Status | Premium station | ||||||||||||||||||||
Station code | SUY | ||||||||||||||||||||
Fare zone | Myki zone 2 | ||||||||||||||||||||
Website | Public Transport Victoria | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 10 February 1859 | ||||||||||||||||||||
Electrified | Yes | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Sunbury railway station is located on the Bendigo line, in Victoria, Australia. It serves the north-western Melbourne suburb of Sunbury, and opened on 10 February 1859. It is the terminus station for Metro Trains Sunbury line services from Flinders Street, and is also served by V/Line services to Bendigo and Echuca.
Disused station Rupertswood is located between Sunbury and Clarkefield.
Sunbury station opened on 10 February 1859, as a terminus, with the line not extended north for two more years. The three track yard dates back from this time, and was unique in Victoria. There was a large goods shed on its southern side, a large silo on its northern side, as well as sheep/cattle ramp and yards. There was also housing for railway staff, including two houses in Horne Street, and the Station Master's house in Brook Street, all demolished in the 1980s.
Proper interlocking of the signals and point work did not exist until 1981, and the station was not fully interlocked until 1998, when a Solid State Interlocking was provided. The layout of the station was again altered, as part of the Regional Fast Rail project, in 2005.
Despite residents of Sunbury voting against the electrification works, due to well founded fears of uncomfortable travel and longer travel times, on 18 November 2012, the station was added to the metropolitan network, when the line from Watergardens was electrified. The station was also upgraded, as part of these works. Electrification to Sunbury was first proposed in the 1970s, along with a new station north of the township, along the Sunbury bank, north of the Jackson Creek bridge, to serve the Goonawarra housing estate. However, after a drop in population estimates, the idea was abandoned.