pole-through 750kV line from the Ukrainian nuclear power plant Khmelnitsky station 750/400 kV Widełka near Kolbuszowej. The photograph was taken near the intersection line with the national road DK19 in Nienadówce, at its border with Stobierna and Medynia Głogowska.
pole-through 750kV line from the Ukrainian nuclear power plant Khmelnitsky station 750/400 kV Widełka near Kolbuszowej. The photograph was taken near the intersection line with the national road DK19 in Nienadówce, at its border with Stobierna and Medynia Głogowska.
Country Poland, Ukraine
General direction west–east
From Widełka substation, Poland 50°11′49″N 21°52′19″E / 50.19694°N 21.87194°E / 50.19694; 21.87194 (Widelka Substation)
Passes through Border between Poland and Ukraine 50°6′2″N 23°17′28.2″E / 50.10056°N 23.291167°E / 50.10056; 23.291167 (Crossing of border between Poland and Ukraine)
To Khmelnitskiy Nuclear Power Plant 50°18′5.06″N 26°38′59.10″E / 50.3014056°N 26.6497500°E / 50.3014056; 26.6497500 (Khmelnitskiy Nuclear Power Plant)
Commissioned 1985
Decommissioned 1993
Type Overhead transmission line
Type of current AC
Total length 395 km (245 mi)
AC voltage 750 kV
No. of circuits 1

The Rzeszów–Khmelnytskyi powerline is an electrical power transmission line between Ukraine and Poland. It is the only 750 kV-powerline in Poland and one of the few of it in the European Union of this type.

The decision to build this powerline was made in 1977 and it went in operation in 1985. The line went out of service after Poland joined the synchronous grid of Continental Europe (UCTE). However, there was a plan to re-activate this line after 2010 by constructing a back-to-back conversion station on the Polish end of the line, but this was not implemented.

In 2016 Energoatom announced it was considering disconnecting unit 2 of the Khmelnitskiy Nuclear Power Plant from the Ukrainian power grid and using the powerline to connect to the Burshtyn TES energy island which operates on the European power grid, to facilitate exports to Poland and Hungary..

It has a length of 395 kilometres (245 mi), of which 281 km (175 mi) in Ukraine and 114 km (71 mi) in Poland. It runs from Widełka substation near Rzeszów in Poland to Khmelnitskiy Nuclear Power Plant in Ukraine. It is an AC line, which has a single circuit. It can transfer a maximum power of 1300 MVA.

As guyed portal pylons are used, strainers are from special design. They consist of three free-standing lattice towers each carrying one conductor. Each strainer tower has a crossbar at which the conductor is led around the structure on a huge insulator.

The line crosses at 50°3′24″N 25°22′5″E / 50.05667°N 25.36806°E / 50.05667; 25.36806 (Crossing of 750 kV-Powerline Widelka-Khmelnitskiy Nuclear Power Plant with 750 kV-Powerline Zakhidnoukrainska-Rivne Nuclear Power Plant) the 750 kV powerline from Zakhidnoukrainska Substation to Rivne Nuclear Power Plant, which may be the only crossing of two 750 kV powerlines in Europe.


...