Burshtyn TES | |
---|---|
Chimneys of Burshtyn coal-fired power station
|
|
Country | Ukraine |
Location | Halych Raion, Ivano-Frankivsk Oblast |
Coordinates | 49°12′37.38″N 24°39′59.53″E / 49.2103833°N 24.6665361°ECoordinates: 49°12′37.38″N 24°39′59.53″E / 49.2103833°N 24.6665361°E |
Construction began | 1962 |
Commission date | 1969 |
Operator(s) | Lvivenergo (1969–1995) Zakhidenergo (1995-present) |
Thermal power station | |
Primary fuel | coal |
Secondary fuel | natural gas |
Tertiary fuel | fuel oil |
Power generation | |
Units operational | 1×208 MW, 3×206 MW, 3×185 MW, 7×195 MW |
Nameplate capacity | 2,334 MW |
Burshtyn TES is a coal-fired power plant of Zakhidenergo located in Halych Raion 6 kilometres (3.7 mi) south-east from Burshtyn, Ivano-Frankivsk Oblast, Ukraine. It has two chimneys which were built in 1966 are also used as high-voltage pylon. The plant has 12 units with a total installed capacity of 2,334 MW. It has a 330 kV double-circuit connection to the 750/330 kV substation called ZahidnoUkrainska (WestUkraine).
The power plant plays an important part in the co-operation between the ENTSO-E and Ukraine. A part of the Ukrainian network called as Burshtyn Island has been disconnected from the main Ukrainian network and re-synchronized to the synchronous grid of Continental Europe. The power plant holds the frequency and phase angle in the Island. The power plant has a 400 kV connection to the Hungarian grid via the substation at Mukacheve.
The Burshtyn TES (formerly Burshtyn GRES, renamed in 1996) was built from 1962 to 1969. The plant was built using concrete block technology. The equipments of the plant were manufactured by more than one hundred companies. In 1965, first gas-fired power unit having a total power of 200 MW were finished. In 1969, the twelfth unit was finished and the plant has been launched into service for "Lvivenergo" with a total capacity of 2,300 MW. Among some other power stations of the company were Dobrotvir TES and Rivne Nuclear Power Plant. In 1975, a computer-based monitoring system was installed. From 1978 to 1980, to reduce pollutant emission, electrostatic ash filters were added to the plant. The ash from filters is used by the building industry to produce cement. In 1984, all of the 12 units has been modified to be able to be fired with natural gas. From 1985 to 1990, the power units no. 9 and 10 has been equipped with asynchronous-synchronous turbogenerators type ASTG-200. This helps to reduce reactive power and increase efficiency and stability. From 1995, according to a presidential order, the power plant became an independent organization and part of the power generating open joint-stock company Zakhidenergo that included Dobrotvir TES and Ladyzhyn TES (part of the former "Vinnytsiaenergo").