Expressway 28 | |
---|---|
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) |
|
Route information | |
Maintained by Jambatan Kedua Sdn Bhd (JKSB) | |
Length: | 24 km (15 mi) |
Existed: | 2006 – present |
History: | Construction works started November 2008 to be completed in May 2012, but was later delayed to February 2014. Opening ceremony on 1 March 2014 at 20:30 MST. Opened to traffic on 2 March 2014 at 00:01 MST. |
Major junctions | |
East end: |
Bandar Cassia (Batu Kawan), Seberang Perai |
North–South Expressway Northern Route Lebuhraya Bandar Cassia Jalan Batu Maung Tun Dr Lim Chong Eu Expressway |
|
West end: | Batu Maung, Penang Island |
Location | |
Primary destinations: |
George Town, Bukit Tambun, Bandar Cassia, Batu Kawan, Simpang Ampat, Juru, Bayan Lepas, Bayan Baru, Batu Maung, Teluk Tempoyak, Permatang Laut, Serdang, Selama, Jelapang, Ipoh |
Highway system | |
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Jambatan Sultan Abdul Halim Muadzam Shah (Jambatan Kedua Pulau Pinang) 苏丹阿都哈林跨海大桥 (槟威第二大桥) சுல்தான் அப்துல் ஹாலிம் முவாட்சாம் ஷா பாலம் |
|
---|---|
Carries | Motor vehicles |
Crosses | South Channel, Malaysia |
Locale | Sultan Abdul Halim Muadzam Shah Bridge |
Official name | Sultan Abdul Halim Muadzam Shah Bridge |
Maintained by | Jambatan Kedua Sdn Bhd (JKSB) |
Characteristics | |
Design |
cable stayed bridge box girder bridge |
Total length | 24 km |
Width | -- |
Longest span | 250 m |
History | |
Designer |
Primary Government of Malaysia Malaysian Highway Authority (LLM) Secondary Package 1 China Harbour Engineering Co Ltd (CHEC) Package 2 UEM Builders Berhad |
Constructed by |
Primary Package 1 China Harbour Engineering Co Ltd (CHEC) Package 2 UEM Builders Berhad Package 3A MAZELE Package 3B IJM Construction Sdn Bhd Package 3C HRA Teguh Sdn Bhd Package 3D SU Citra Bina Sdn Bhd Secondary Minconsult Sdn Bhd (C&S Consultant) (Consultanting Engineer) |
Construction end | February 2014 |
Inaugurated | 1 March 2014 at 20:30 MST |
Opened | 2 March 2014 at 00:01 MST |
Penang Second Bridge Integrated Toll Plaza Bandar Cassia-PLUS Toll Plaza (Gateway Arch Toll Plaza) |
|
---|---|
Plaza Tol Bersepadu Jambatan Kedua Pulau Pinang Plaza Tol PLUS Bandar Cassia (Plaza Tol Pintu Gerbang) |
|
General information | |
Architectural style | Structural expressionism |
Location |
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge), Penang, Malaysia |
Construction started | 2011 |
Completed | February 2014 |
Opened | 2 March 2014 at 00:01 MST |
Inaugurated | 1 March 2014 at 20:30 MST |
Renovated | February 2014 |
Technical details | |
Floor count | 28 booths |
The Sultan Abdul Halim Muadzam Shah Bridge or Penang Second Bridge (Malay: Jambatan Sultan Abdul Halim Muadzam Shah or Jambatan Kedua Pulau Pinang, Chinese: 苏丹阿都哈林跨海大桥, Tamil : சுல்தான் அப்துல் ஹாலிம் முவாட்சாம் ஷா பாலம் or பினாங்கு இரண்டாவது பாலம்) E28 is a dual carriageway toll bridge in Penang, Malaysia. It connects Bandar Cassia (Batu Kawan) in Seberang Perai on mainland Peninsular Malaysia with Batu Maung on Penang Island. It is the second bridge to link the island to the mainland after the first Penang Bridge. The total length of the bridge is 24 km (15 mi) with length over water at 16.9 km (10.5 mi), making it the longest bridge in Malaysia and the longest in Southeast Asia. China Harbour Engineering Co Ltd (CHEC), a main contractor for the second bridge was expected to start work on the second Penang bridge in November 2007 and complete the project in 2011, but the completion date was then postponed to May 2012, and later to February 2014. Construction started in November 2008. To reduce the cost of construction, its design was then modified to resemble the first cable stayed Penang Bridge. The bridge has been built with a large loan from the People's Republic of China to continue and maintain the economic relationship between China and Malaysia. The bridge was officially opened on 1 March 2014 at 20:30 MST and was named after the fourteen Yang di-Pertuan Agong, Tuanku Abdul Halim Muadzam Shah of Kedah and was assigned with the route number E28.