*** Welcome to piglix ***

Peak Forest Tramway


The Peak Forest Tramway was an early horse- and gravity-powered industrial railway (or tramway) system in Derbyshire, England. Opened for trade on 31 August 1796, it remained in operation until the 1920s. Much of the route and the structures associated with the line remain. The western section of the line is now the route of the Peak Forest Tramway Trail.

The tramway was originally planned to be about 4 miles (6 kilometres) long from Chapel Milton to Dove Holes. However, it was decided to start the tramway at Bugsworth (now called Buxworth) and, as built, it was about 6 miles (10 kilometres) long. Its purpose was to carry limestone from the vast quarries around Dove Holes down to Bugsworth Basin via Chapel-en-le-Frith and Chinley, where much of it was taken by boat along the Peak Forest Canal and the Ashton Canal to Manchester and beyond. The remaining limestone was put into lime kilns at Bugsworth where it was converted into quick lime (or burnt lime).

Built by Benjamin Outram, the tramway was initially single-track, on a 4 ft 2 in (1,270 mm) gauge, constructed of stone sleeper blocks and L-section cast-iron rails that were fastened directly onto the blocks, in the same manner as his Little Eaton Gangway built for the Derby Canal. The rails, known as gang rails or plates, were provided by Benjamin Outram and Company who also supplied the mineral waggons.

From Bugsworth it rose 129 feet (39 m) to Whitehough, then proceeded to Chapel Milton on the level. It then climbed 56½ to the base of the inclined plane, which took the line upwards 192 feet (59 m) over a distance of 512 yards (468 m). After a more gentle slope to Barmoor Clough the line proceeded to the Dove Holes quarries.


...
Wikipedia

...