Ashton Canal
Ashton Canal |
The Ashton Canal at Droylsden
|
Specifications |
Length |
6 miles (9.7 km) |
Maximum boat length |
70 ft 0 in (21.34 m) |
Maximum boat beam |
7 ft 0 in (2.13 m) |
Locks |
18 |
Status |
Navigable |
Navigation authority |
Canal & River Trust |
History |
Principal engineer |
Benjamin Outram |
Date of act |
1792 |
Date of first use |
1796 |
Date completed |
1797 |
Date closed |
1961 |
Date restored |
1974 |
Geography |
Start point |
Ashton-under-Lyne |
End point |
Ducie St Jn, Manchester |
Branch(es) |
Hollingwood Branch Canal, Stockport Branch, Islington Branch Canal |
Connects to |
Huddersfield Narrow Canal, Peak Forest Canal, Rochdale Canal |