*** Welcome to piglix ***

North–South Expressway (Singapore)

NSE-SG.svg

North–South Expressway
Lebuhraya Utara-Selatan
南北高速公路
வடக்கு-தெற்கு விரைவுச்சாலை
North - South Expressway is labelled in single violet line
Route information
Length: 21.5 km (13.4 mi)
History: Construction begin in 2017, completion in 2023
Major junctions
North end: Admiralty Road West
  SLE, PIE, CTE, ECP
South end: ECP, Republic Avenue and Nicoll Highway
Highway system
Expressways of Singapore

NSE-SG.svg

The North–South Expressway (Abbreviation: NSE) will be the 11th of Singapore's network of expressways when completed. The North South Expressway will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). This new expressway was announced on 30 January 2008 as part of a major review of Singapore's transport network by the Land Transport Authority (LTA). The 21 kilometres (13 mi) expressway would cost about S$7–8 billion when fully completed in 2023 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.

On 19 January 2011, the government gave the green light to build the expressway between Admiralty Road West and Toa Payoh Rise. On 15 November 2011, LTA unveiled the full alignment of the North-South Expressway. Construction works will commence in 2017. The North South Expressway will have a total of 16 entrances and 17 exits to connect towns along the north-south corridor—Woodlands, Sembawang, Yishun, Ang Mo Kio, Bishan and Toa Payoh—with the city centre. The NSE will also provide links to existing expressways, including the Seletar Expressway (SLE), Pan-Island Expressway (PIE) and East Coast Parkway (ECP).


...
Wikipedia

...