*** Welcome to piglix ***

MBTA History (Green Line)

GREEN LINE
Inbound train at Tappan Street, June 2014.JPG
Green Line train built by AnsaldoBreda on the "C" Branch
Overview
Type Light rail
System Massachusetts Bay Transportation Authority
Locale Boston, Massachusetts
Termini East terminals:
Lechmere (E)
North Station (C)
Government Center (D)
Park Street (B)
West terminals:
Boston College (B)
Cleveland Circle (C)
Riverside (D)
Heath Street (E)
Stations 66 (total)
Services
Daily ridership 232,000 (Q2 2015)
Operation
Opened September 1, 1897; 119 years ago (1897-09-01) (Tremont Street Subway)
Owner MBTA
Operator(s) MBTA
Character Subway, grade-separated ROW, street running
Rolling stock Kinki Sharyo Type 7
AnsaldoBreda Type 8
Technical
Line length 23 miles (37 km)
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Minimum radius 10 m (32.808 ft)
Electrification 600 V DC Overhead catenary
Route map
Future extension (2021)
Route 16 (proposed)
College Avenue
Ball Square
Magoun Square
Gilman Square
East Somerville
Union Square
Green Line Extension (2021)
Lechmere (new site)
Lechmere
Lechmere Viaduct
over Charles River
Science Park
Causeway Street Elevated (
closed
2004
)
 Orange Line 
North Station Amtrak MBTA.svg
Canal Street Incline (
closed
2004
)
Tremont Street Subway
Haymarket
Wikipedia

...