*** Welcome to piglix ***

Kuching General Hospital

Sarawak General Hospital
27 August 2011 Sarawak General Hospital.jpg
The Sarawak General Hospital
Geography
Location Kuching, Sarawak, Malaysia
Coordinates 1°32′35″N 110°20′21″E / 1.54306°N 110.33917°E / 1.54306; 110.33917Coordinates: 1°32′35″N 110°20′21″E / 1.54306°N 110.33917°E / 1.54306; 110.33917
Organisation
Hospital type General
Affiliated university Universiti Malaysia Sarawak
Services
Emergency department Yes
Beds 765
Helipad Yes
History
Founded 1870
Links
Website hus.moh.gov.my
Lists Hospitals in Malaysia

Sarawak General Hospital (Malay: Hospital Umum Sarawak) is the largest hospital in the state of Sarawak, Malaysia. It is the main tertiary and referral hospital in East Malaysia. In its earlier years it was known as Kuching General Hospital.

Sarawak General Hospital has been in existence since 1870. However, no proper historical records have been preserved of its existence.

The earliest record about the hospital is from 1910. Based from this documentation, the hospital was initially located at the current site of the Kuching Central Prison and a total of 920 patients were admitted to the hospital during that year.

In 1925, construction of a new hospital started at the hospital's current location at Jalan Tun Abang Haji Openg. The new hospital was operational from 1931. From its foundation up until at least the outbreak of World War II, the hospital was known as Kuching General Hospital.

After World War II, the hospital was unable to meet the growing needs of the population. In 1957, a proposal to build a new and modern hospital was put forward. A total of RM13.5 million was spent for the 1964 - 1968 Development Plan and the consultation and management fees amounting to RM8.2 million was paid for by the Australian Government under the Colombo Plan.

The construction of the hospital was planned in 2 phases. Phase I involved the building of an 8-story Main Block, including the Emergency Unit. Phase I construction began in 1965 and was completed in May 1970. By then, the cost of construction grew to RM17.8 million. The lion's share of the cost amounting RM17.3 million was borne by the federal government while the rest was paid by the state government.

Phase II involved the completion of an extra floor in the east wing and an additional five stories in the western part of the Main Block. Phase II construction began in September 1970 and was completed in 1972.

The new hospital then was able to accommodate 582 patients and had many modern facilities.

The subsequent years, many additions were made to the hospital, including:

The main block of the hospital underwent renovation and refurbishment, which was completed in September 2009. SGH currently has 1005 beds and is on par with other hospitals in Malaysia and Asia.


...
Wikipedia

...