Kawasaki Heavy Industries & CSR Qingdao Sifang C151B
|
|
---|---|
Exterior image of the C151B rolling stock at Bishan Depot
|
|
In service | 16 April 2017–present |
Manufacturer |
CRRC Qingdao Sifang |
Built at | Qingdao, Shandong, China |
Constructed | 2015 - 2017 |
Entered service | 2017 |
Number built | 270 vehicles (45 trainsets) |
Number in service | 240 vehicles (40 trainsets) |
Formation | 6 per trainset DT–M1–M2–M2–M1–DT |
Fleet numbers | 601/602–689/690 |
Capacity | 1920 passengers |
Operator(s) | SMRT Trains (SMRT Corporation) |
Depot(s) |
Bishan Tuas Ulu Pandan Changi East Coast (Future) |
Line(s) served |
EWL East West Line NSL North South Line |
Specifications | |
Car body construction | Aluminium-alloy construction |
Car length | 23.5 m (77 ft 1 1⁄4 in) |
Width | 3.2 m (10 ft 6 in) m |
Height | 3.7 m (12 ft 1 5⁄8 in) |
Doors | 1,450 millimetres (57 1⁄16 in), 8 per car |
Maximum speed | 90 km/h (56 mph) (design) 80 km/h (50 mph) (service) |
Traction system |
IGBT-VVVF (Fuji Electric) Output 415 kVA x2 |
Prime mover(s) |
Fuji Electric MLR109 Self-Ventilated Three-Phase Induction Motor |
Acceleration | 1.0 m/s2 (3.3 ft/s2) |
Deceleration | 1.2 m/s2 (3.9 ft/s2) (service) 1.3 m/s2 (4.3 ft/s2) (emergency) |
Auxiliaries |
IGBT–VVVF Auxiliary Inverter with Battery Charger 80 kVA–16 kW |
Electric system(s) | 750 V DC third rail |
Current collection method | Collector shoe |
Safety system(s) | Thales SelTrac® Moving Block CBTC, ATC with subsystems of ATO GOA 3 (DTO), ATP, NetTrac ATS, CBI |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
The Kawasaki Heavy Industries & CSR Qingdao Sifang C151B is the fifth generation Electric multiple unit rolling stock in operation on the North South and East West Lines of Singapore's Mass Rapid Transit (MRT) system. 45 trains were purchased and all of them have been delivered to Singapore as of 12 April 2017.SMRT took delivery of the first 2 train cars on 21 May 2015. These trains will increase frequency for the two MRT lines, North South Line and East West Line.
These trains retain the same IGBT-VVVF found C151A and it is the first train to have a white front with a smaller logo. These trains are the first to be fitted with STARiS 2.0, which is embedded in the door's overhead panels, as factory stock and also the first amongst the rolling stock used on the North South Line and East West Line to have electric door actuators rather than the traditional pneumatic door actuators on previous generations of rolling stock, allowing smoother and more reliable door operations, reducing delays. The first C151B train (Set 601/602) made its debut on the North South Line on 16 April 2017.
Some of the C151B trains are currently housed in Tuas Depot and will only begin revenue service on the East West Line (alongside with TWE) when the new signalling system is ready. As of 2017 and early 2018, the C151B trains are only serving the North South Line, where the new signalling system is currently active. In early 2018, some of the trains housed at Tuas Depot also started to operate on the Tuas West Extension where the new signalling system has been installed. During the new signalling system tests, some trains also operated on the mainline East West Line, starting on 6 May 2018.