*** Welcome to piglix ***

Kampung Selamat MRT station

 SBK02 
Kampung Selamat
MRT station
MRT SBK Kampung Selamat station.jpg
Platform level of Kampung Selamat station.
Other names كامڤوڠ سلامت (Jawi alphabet)
甘榜士拉玛 (Chinese)
கம்புங் சேலாபாய் (Tamil)
Location Sungai Buloh, Selangor
Malaysia
Coordinates 3°11′50.53″N 101°34′42.33″E / 3.1973694°N 101.5784250°E / 3.1973694; 101.5784250Coordinates: 3°11′50.53″N 101°34′42.33″E / 3.1973694°N 101.5784250°E / 3.1973694; 101.5784250
Owned by MRT Corp
Line(s)  9  Sungai Buloh–Kajang Line
 12  Sungai Buloh–Serdang–Putrajaya Line Under construction
Platforms 2 side platforms
Tracks 2
Construction
Structure type Elevated
Parking Not available
Other information
Station code  SBK02 
History
Opened 16 December 2016
Services
Preceding station   Rapid KL   Following station
Terminus
Sungai Buloh-Kajang Line
towards Kajang
Terminus
Sungai Buloh-Serdang-Putrajaya MRT Line
(under construction)
towards Putrajaya Sentral (under construction)

The Kampung Selamat station is a mass rapid transit station serving the suburb of Kampung Baru Sungai Buloh in Sungai Buloh, Selangor, Malaysia. It serves as one of the temporary stations on the Mass Rapid Transit (KVMRT) Sungai Buloh-Kajang Line and will be reintegrated into the future MRT Sungai Buloh-Serdang-Putrajaya Line when the construction is completed.

The name Kampung Selamat (literally means 'Safe Village' in Malay) is taken from a small village adjacent to the station location on the east side of Jalan Sungai Buloh. During the proposal stage, the station's working name was the Kampung Baru Sungai Buloh Station.

The station is an elevated station located on the east side of Jalan Sungai Buloh. The design of the station is the standard elevated station design comprising two levels above the ground level. The first level is the concourse level, the two side platforms flanking the double tracks above.

The station features a long pedestrian bridge over Jalan Sungai Buloh which links the stations to two entrances as well as the future link bridge directly into the SqWhere and D'sara Sentral developments across the road.

When Phase One operations for the MRT Sungai Buloh-Serdang-Putrajaya Line begin, expected to be in 2021, this station will become part of this line and cease to be part of the MRT Sungai Buloh-Kajang Line. This is because Kwasa Damansara station will be the first station for both the MRT Sungai Buloh-Kajang Line and the MRT Sungai Buloh-Serdang-Putrajaya Line.

The station is has three entrances, with Entrance A on the same side of Jalan Sungai Buloh as the station, and Entrances B and C as well as the future link bridges to the SqWhere SOVO, a mixed development project by Selangor Dredging Berhad which is currently under construction, and D'sara Sentral developments, a soon to be completed mixed development project by the Mah Sing Group, on the other side of Jalan Sungai Buloh from the station and linked via a long pedestrian bridge.


...
Wikipedia

...