Kwasa Damansara station

 SBK04 
Kwasa Damansara
rapid transit station
MRT SBK Kwasa Damansara station.jpg
The exterior of the Kwasa Damansara station from the carpark. The station has three levels; one level on the ground and two levels meant for the platforms for SBK & SSP for cross-platform interchange.
Location Kwasa Damansara, Selangor
Malaysia
Coordinates 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E / 3.176472; 101.572556Coordinates: 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E / 3.176472; 101.572556
Owned by MRT Corp
Line(s)  9  MRT Sungai Buloh–Kajang line (Operational)
Platforms 4 stacked island
cross-platform interchange
(Terminus)
Tracks 4
Connections  12  MRT Sungai Buloh–Serdang–Putrajaya line (Under construction)
Construction
Parking Available, pay.
Other information
Station code  SBK04 
History
Opened 16 December 2016; 4 months ago (2016-12-16)
Services

Preceding station   KVMRT   Following station
toward Sungai Buloh
Sungai Buloh-Kajang Line
toward Semantan
Terminus Sungai Buloh-Serdang-Putrajaya Line
(under construction)
toward Putrajaya Sentral (under construction)

The Kwasa Damansara station is a metro station or locally known as mass rapid transit (MRT) station that will serve the future suburb of Kwasa Damansara in Selangor, Malaysia. It is currently one of the stations on the Sungai Buloh-Kajang Line but will later become the interchange station between the line and the future Sungai Buloh-Serdang-Putrajaya Line which is scheduled to be opened in 2021.

Although the tracks at the Kwasa Damansara station are elevated, the station building itself is at-grade, the only one of its kind on the MRT Sungai Buloh-Kajang Line.

The station has three levels, with the ground floor being the concourse and the two floors above being platform levels. The two elevated platforms are island platforms, enabling this station to have four platforms to enable it to function as the interchange station between the MRT Sungai Buloh-Kajang Line and the future MRT Sungai Buloh-Serdang-Putrajaya Line.

At present, only Platform 1 for Semantan-bound trains on Level 2, and Platform 2 for Sungai Buloh-bound trains on Level 1 are being used. Platform 3, across from Platform 1 on Level 2 and Platform 4 which shares Level 1 with Platform 2, are not in use and do not have any tracks.

When the Phase One operations for the MRT Sungai Buloh-Serdang-Putrajaya Line begin, expected to be in 2021, this station will be the first station of the line. At the same time, this station and not Sungai Buloh station, will be the northern terminus of the MRT Sungai Buloh-Kajang Line. As a result, the Kampung Selamat station and Sungai Buloh which are currently part of the MRT Sungai Buloh-Kajang Line will become stations on the MRT Sungai Buloh-Serdang-Putrajaya Line.


...