SBK04
Kwasa Damansara |
||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MRT station | ||||||||||||||||
The exterior of the Kwasa Damansara station.
|
||||||||||||||||
Other names |
قواس دامنسارا (Jawi alphabet) 桂莎白沙罗 (Chinese) குவாசா டமன்சரா (Tamil) |
|||||||||||||||
Location |
Kwasa Damansara, Selangor Malaysia |
|||||||||||||||
Coordinates | 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°ECoordinates: 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E | |||||||||||||||
Owned by | MRT Corp | |||||||||||||||
Line(s) |
9 Sungai Buloh–Kajang Line 12 Sungai Buloh–Serdang–Putrajaya Line (Under construction) |
|||||||||||||||
Platforms | 4 stacked island cross-platform interchange (Terminus) |
|||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 3 | |||||||||||||||
Parking | Available with payment. 550 parking bays; 100 motorcycle bays. | |||||||||||||||
Other information | ||||||||||||||||
Station code | SBK04 | |||||||||||||||
History | ||||||||||||||||
Opened | 16 December 2016 | |||||||||||||||
Services | ||||||||||||||||
|
The Kwasa Damansara station is a mass rapid transit (MRT) station that serves the future suburb of Kwasa Damansara in Selangor, Malaysia. It is currently one of the stations on the Mass Rapid Transit (KVMRT) Sungai Buloh-Kajang Line but will later become the interchange station between the line and the future MRT Sungai Buloh-Serdang-Putrajaya Line which is scheduled to be opened in 2021.
Although the tracks at the Kwasa Damansara station are elevated, the station building itself is at-grade, the only one of its kind on the MRT Sungai Buloh-Kajang Line.
The station has three levels, with the ground floor being the concourse and the two floors above being platform levels. The two elevated platforms are island platforms, enabling this station to have four platforms to enable it to function as the interchange station between the MRT Sungai Buloh-Kajang Line and the future MRT Sungai Buloh-Serdang-Putrajaya Line.
At present, only Platform 1 for Semantan-bound trains on Level 2, and Platform 2 for Sungai Buloh-bound trains on Level 1 are being used. Platform 3, across from Platform 1 on Level 2 and Platform 4 which shares Level 1 with Platform 2, are not in use and do not have any tracks.
When Phase One operations for the MRT SSP MRT Line begins in 2021, this station will be the first station of the line. This station will hence replace Sungai Buloh station as the northern terminus of the MRT Sungai Buloh-Kajang Line. As a result, the Kampung Selamat station and Sungai Buloh which are currently part of the SBK MRT Line will be lost to the SSP Line.