DT22
Jalan Besar 惹兰勿刹 ஜலன் பசார் Jalan Besar |
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Construction of Jalan Besar MRT station.
|
|||||||||||
Operated by | SBS Transit DTL | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 3 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | DT22 | ||||||||||
History | |||||||||||
Opened | End-2017 | ||||||||||
Previous names | Sungei Road | ||||||||||
Services | |||||||||||
|
|||||||||||
Location | |||||||||||
Jalan Besar MRT Station (DT22) is a future underground Mass Rapid Transit station on the Downtown Line in Rochor planning area, Singapore. The station is located under Jalan Besar, hence its name.
Jalan Besar station is within walking distance to Rochor station.
The construction had begun in July 2011 when the Pasar Lane and Pitt Street was closed to make way for Downtown Line with the road realigned on 6 April 2012.