Guangzhou–Zhuhai Intercity Railway 广珠城际铁路 |
|||
---|---|---|---|
Zhuhai North Station
|
|||
Overview | |||
Type | High-speed rail | ||
Status | Operational | ||
Locale |
Guangzhou Foshan Zhongshan Jiangmen Zhuhai Macau |
||
Termini |
Guangzhou South Zhuhai/Xinhui |
||
Stations | 22 | ||
Services | 2 | ||
Ridership | 342,000 | ||
Operation | |||
Opened | 7 January 2011 | ||
Operator(s) | China Railway High-speed | ||
Technical | |||
Line length | 187 km (116.196 mi) | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||
Operating speed | 250 km/h (155 mph) | ||
|
Guangzhou-Zhuhai Intercity Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line length: | 187 km (116 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge: | 1,435 mm (4 ft 8 1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maximum speed: | 250 km/h (155 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations and structures | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Guangzhou–Zhuhai Intercity Railway | |||||||||||||
Simplified Chinese | 广珠城际轨道交通 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 廣珠城際軌道交通 | ||||||||||||
|
|||||||||||||
Alternative Chinese name | |||||||||||||
Simplified Chinese | 广珠城轨 | ||||||||||||
Traditional Chinese | 廣珠城軌 | ||||||||||||
|
Transcriptions | |
---|---|
Standard Mandarin | |
Hanyu Pinyin | Guǎngzhū Chéng Jì Guǐdào Jiāotōng |
Yue: Cantonese | |
Yale Romanization | Gwóngjyū Sìhng Jai Gwáidouh Gāautūng |
Jyutping | Gwong2zyu1 Sing4 Zai3 Gwai2dou6 Gaau1tung1 |
Transcriptions | |
---|---|
Standard Mandarin | |
Hanyu Pinyin | Guǎngzhū Chéng Guǐ |
Yue: Cantonese | |
Yale Romanization | Gwóngjyū Sìhng Gwái |
Jyutping | Gwong2zyu1 Sing4 Gwai2 |
Guangzhou–Zhuhai Intercity Railway or Guangzhu Intercity Railway (Chinese: 广州-珠海城际快速轨道; abbreviated as 广珠城轨 Guǎng-Zhū chéng guǐ) is a dedicated, grade-separated passenger railway linking New Guangzhou Station in Panyu, Guangzhou, and Zhuhai Airport in Zhuhai, via Shunde, Zhongshan and Jiangmen, in Guangdong, China. It is the first line completed in the currently under construction Pearl River Delta Rapid Transit network.
The railway has partly started operations in January 2011. It will be divided into three parts with a total of 27 stations. Its main line between Guangzhou and Zhuhai City, via Shunde and Zhongshan, is 117 km (73 mi) long, with 17 stations and a maximum speed of 200 km/h (124 mph). The planned extension from Zhuhai City to Zhuhai Airport is 35.3 km (22 mi) long, with 7 stations and a maximum speed of 160 km/h (99 mph). Its spur line between Zhongshan and Jiangmen is 26 km (16 mi) long, with 6 stations and a maximum speed of 200 km/h (124 mph).
When fully completed, passengers traveling on the main line between Zhuhai and Guangzhou South will have a choice between a 46-minute non-stop and a 76-minute, 140 km/h all-stop service. The non-stop service is offered between Zhuhai and Guangzhou South only, and travel between Zhuhai (Gongbei) and Zhuhai Airport will be cut down to 25 minutes. It currently takes 50 minutes to travel by auto from Gongbei, Zhuhai to Zhuhai Airport, and 1 hour 30 minutes from Gongbei, Zhuhai to Panyu, Guangzhou.
The construction of the railway began in 2005 and it was to be completed by 2010 to cope with the opening of the Guangzhou Asian Games, but missed this deadline.