*** Welcome to piglix ***

Changi Airport MRT Station

MRT Singapore Destination 3.png
 CG2 
Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport
Rapid transit
CGA PLAT.JPG
Changi Airport station platform level.
Location 70 Airport Boulevard
Singapore 819661
Coordinates 1°21′26.54″N 103°59′19.81″E / 1.3573722°N 103.9888361°E / 1.3573722; 103.9888361
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 3 (excluding street level)
Parking Yes (Changi Airport)
Bicycle facilities Yes (Changi Airport)
Disabled access Yes
Other information
Station code  CG2 
History
Opened 27 February 2002
Electrified Yes
Services
Preceding station   Mass Rapid Transit   Following station
towards Tanah Merah
East West Line
Changi Airport Branch Line
Terminus
Location

Changi Airport MRT Station (CG2) is an underground Mass Rapid Transit terminal station on the East West Line in Changi, Singapore. The station is located within Singapore Changi Airport, hence its name.

The station was opened on 25 February 2002, while the ceremony held on 27 February 2002 by the then Minister for Transport, Mr Yeo Cheow Tong as one of the terminal Mass Rapid Transit (MRT) stations for the East West Line, and located in between Singapore Changi Airport's Terminal 2 and Terminal 3.

Changi Airport had been operating since its opening in 1981 with no rail link and with full reliance on taxi and bus connections, proven effective given the short 20 kilometre distance to the city via the East Coast Parkway and their relative affordability. Public buses also provide cheap express trips to the city, and link commuters to the MRT network at Bedok, Tampines and Pasir Ris. There was thus no pressing need to build the rail line despite regional competition, and was only given the green light when the Singapore Expo was built along the line and helping to add potential traffic.

The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah, with some conceptual plans showing a tentative route alignment up to the airport along Airport Boulevard, continuing beyond the airport to Changi Point, before turning southwest back towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.


...
Wikipedia

...