Carrington | |
---|---|
St George's Church, a Grade II* listed building |
|
Carrington shown within Greater Manchester | |
Population | 396 (2001 Census) |
OS grid reference | SJ737921 |
Metropolitan borough | |
Metropolitan county | |
Region | |
Country | England |
Sovereign state | United Kingdom |
Post town | MANCHESTER |
Postcode district | M31 |
Dialling code | 0161 |
Police | Greater Manchester |
Fire | Greater Manchester |
Ambulance | North West |
EU Parliament | North West England |
UK Parliament | |
Carrington is a village and civil parish in the Metropolitan Borough of Trafford, Greater Manchester, England.Historically a part of Cheshire, the village is west of Greater Manchester Urban Area, and is the site of a large gas and chemical works, which produce gases by fractional distillation of liquid air. It used to be the site of a Shell Chemicals refinery, which produced polythene and polystyrene.
Until recent years there was a Carrington Power Station located on the south bank of the Manchester Ship Canal. The building work commenced in 1947, although the land for the site was acquired in 1916. The station opened in 1956, and was decommissioned during the late 1980s. It was demolished using explosives in 1991, having stood empty for several years. All that remains today is a large 400 kV switching station. The station had its own railway spur from the Glazebrook to line, evidence of which can still be seen today from the gates where the line crossed Manchester Road.
In July 2007, Bridestones Developments acquired planning permission for a new CCGT (Combined Cycle Gas Turbine) power station, to be built on the same site as the old power station. Construction of the new power station began in 2013 and is due to complete in 2016. The new power station will generate three times the energy as the old coal-fired power station, will occupy only half of the space of the old site and will emit only half of the carbon dioxide. Around 600 people have been involved in its construction and when it is finally operation there will be around 40 staff employed at the power station. The new power station will generate up to 880MW of electricity which is enough to supply approximately one million homes. Some of the parts for the new plant were so large that they were transported to the site via the Manchester ship canal