Bandar Malaysia South
|
|||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
station | |||||||||||
Location |
Bandar Malaysia, Kuala Lumpur Malaysia |
||||||||||
Owned by | MRT Corp | ||||||||||
Line(s) | 1 7 12 13 HSR ETS | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | Available, pay | ||||||||||
Other information | |||||||||||
Station code | SSP22 | ||||||||||
Services | |||||||||||
|
The Bandar Malaysia railway station is a railway station and a high-speed rail terminus under construction as part of the Bandar Malaysia project in Kuala Lumpur, Malaysia. The station is planned to serve as a gateway to Kuala Lumpur with the under-planning Kuala Lumpur–Singapore High Speed Rail from Singapore, as well as a secondary transport hub after KL Sentral, connecting KLIA Transit, KTM Komuter and the Sungai Buloh–Serdang–Putrajaya MRT line. It will also primarily serve the south part of Bandar Malaysia, with the north being served by Bandar Malaysia North. The station will be built at the site of Simpang Airport together with Bandar Malaysia North station and the rest of the Bandar Malaysia development.
The station will also be called the Bandar Malaysia South MRT station for the MRT station in the transport hub, set to be complete by 2022.