Ascó Nuclear Power Plant | |
---|---|
View of the cooling tower of the Ascó nuclear power plant
|
|
Official name | Central nuclear de Ascó |
Country | Spain |
Coordinates | 41°12′0″N 0°34′10″E / 41.20000°N 0.56944°ECoordinates: 41°12′0″N 0°34′10″E / 41.20000°N 0.56944°E |
Construction began | 1971 |
Commission date | December 10, 1984 |
Owner(s) | Endesa |
Operator(s) | Asociación Nuclear Ascó-Vandellòs (ANAV) A.I.E. (ENDESA/ID) |
Power generation | |
Units operational | 2 totaling 2060 MW |
Average generation | 15,474 GW·h |
Ascó Nuclear Power Plant (Catalan: Central Nuclear d'Ascó, Spanish: Central Nuclear de Ascó) is a nuclear power station located in Ascó, Catalonia, in Spain.
It consists of two PWRs of 933 and 943 MWe.
An INES level 2 incident occurred on November 2007 at the Unit 1 reactor. The Spanish Nuclear Safety Council (CSN) was not advised of the leak until April 4. Although the leak happened in November, particles were not detected outdoors until March 2008.
CSN initially estimated that total radioactivity detected was about 235,000 becquerels. The council operating the plant later estimated that a maximum of 84.95 million becquerels of radioactivity were spilled. CSN announced it was changing the classification of the leak from Level 1 to Level 2 because of "inadequate control of radioactive material and of providing incomplete and deficient information to the controlling body." An investigation was opened and the director of the plant was .