Aberdeen Tunnel

Aberdeen Tunnel
A two-lane road in a tunnel with plain brown sides and one overhead light strip.
Inside of northbound bore.
Overview
Other name(s) 香港仔隧道
Location Hong Kong Island, Hong Kong
Coordinates 22°15′39″N 114°10′52″E / 22.26086°N 114.18108°E / 22.26086; 114.18108Coordinates: 22°15′39″N 114°10′52″E / 22.26086°N 114.18108°E / 22.26086; 114.18108
Route Route 1
Start Wong Chuk Hang
End Happy Valley
Operation
Opened March 12, 1982 (1982-03-12)
Owner Hong Kong Link
Operator Transport Infrastructure Management Ltd.
Character Limited-access
Toll HK$5
Vehicles per day 64,114 (May 2015)
Technical
Length 1.9 kilometres (1.2 mi)
Number of lanes 4
Operating speed 70 kilometres per hour (43 mph)

Aberdeen Tunnel (Chinese: 香港仔隧道; pinyin: Xiānggǎngzǎi Suìdào; Cantonese Yale: heung1 gong2 jai2 seui6 dou6) is a two-tube tunnel linking Happy Valley and Wong Chuk Hang near Aberdeen on the Hong Kong Island, Hong Kong. It shortens the travel time between Wong Chuk Hang and Causeway Bay of the Hong Kong Island. It connects the Wong Chuk Hang Road and Canal Road Flyover in the Hong Kong Island. The toll plaza is at the Wong Chuk Hang end.

The toll is HK$5. The tunnel is 1.9 kilometres (1.2 mi) long and was used by 64,114 vehicles daily in 2015.

Aberdeen Tunnel is currently managed by Transport Infrastructure Management Limited.

A tunnel was planned in the long-term development plan for Aberdeen approved by the Governor-in-Council in 1964. Support for the tunnel grew following the closure of the Wong Nai Chung Gap by landslides. In 1970, Aberdeen kaifong leaders and industrialists called on the government to build the tunnel. A pilot tunnel was dug in the mid-1970s to examine underground rock conditions. Official approval for the full project, comprising the tunnel and the Canal Road flyover extension, was granted in late 1975. The opening of the tunnel was much delayed by both difficult tunneling conditions, and the late arrival of communications equipment from overseas. The contractor was Dragages Hong Kong.

The tunnel opened on 12 March 1982. From the very beginning, the tunnel suffered from congestion at the approach roads. In 1991, the toll was raised from $3 to $5.

The Aberdeen Tunnel's operations and management were privatised in 1991. It was contracted out to the Cross Harbour Tunnel Company initially. Tunnel management was contracted out to Serco Group (HK) Ltd. on 29 September 1998, and then to Transport Infrastructure Management Ltd. on 29 September 2014.


...