Valle Solar Power Station | |
---|---|
Valle Solar Power Station (Valle 1 and Valle 2)
|
|
Official name | Valle 1 y Valle 2 (Spanish) |
Country | Spain |
Location | near San José del Valle, Cádiz |
Coordinates | 36°39′40″N 5°50′24″W / 36.66111°N 5.84000°WCoordinates: 36°39′40″N 5°50′24″W / 36.66111°N 5.84000°W |
Status | Operational |
Construction began | December 2009 |
Commission date | January 2012 |
Construction cost | €540 million (US$700 M) |
Owner(s) | Torresol Energy |
Solar field | |
Type | CSP |
CSP technology | Parabolic trough |
Collectors | 2 × 624 |
Site area | 4.6 km2 (2 sq mi) |
Site resource | 2,097 kWh/m2/yr |
Power generation | |
Units operational | 2 |
Nameplate capacity | 100 MW |
Capacity factor | 37% |
Storage capacity | 7.5 hours (each unit) |
Annual net output | 340 GWh |
The Valle Solar Power Station is a two adjacent twin 50 MW solar thermal power plants (Valle 1 and Valle 2) in San José del Valle, Cádiz, Spain. The station generates power using parabolic trough technology. It became operational in January 2012. The Valle plant is owned by Torresol Energy, a joint venture between SENER (60%) and the Abu Dhabi Future Energy Company (40%). It was built by SENER between December 2009 and December 2011, at a cost of €540 million (US$700 million).
Construction on Valle 1 and Valle 2 began in December 2009 and was completed in December 2011. Roughly 4,500 workers dedicated over 2.7 million labor hours over the two years of construction until the plants were commissioned and connected to the Spanish national grid. Each 50 MWe has the capacity to supply 160 Gwh of safe, clean power per year, to supply 40,000 homes. Together they reduce CO2 emissions by 90,000 tons every year. Their molten salt storage system allows them to continue producing electricity even without solar radiation. In addition to providing a manageable source of clean power, they can also supply electricity to the power grid based on demand.
The power station consists of two adjacent plants, Valle 1 and Valle 2. Each one has a nameplate capacity of 50 MW, using SENER parabolic trough collectors creating solar fields of 510,120 square metres on a total surface area of 460 hectares (1,100 acres). Net electrical output for each section is expected to be 160 gigawatt-hours (GW·h) per year. Each plant will have a molten salt thermal storage system containing 28,500 tons of molten salt (60% sodium nitrate / 40% potassium nitrate), capable of storing enough heat to generate 750 MWh of electricity — enough to operate at full power for 7.5 hours without sunshine.