*** Welcome to piglix ***

Ulster Canal

Ulster Canal
Bridge over Ulster Canal, Tyholland - geograph.org.uk - 673307.jpg
The remains of the Ulster Canal at Tyholland
Specifications
Length 46 miles (74 km)
Locks 26
Status abandoned
History
Date completed 1842
Date closed 1931
Geography
Start point Charlemont, Lough Neagh
End point Wattle Bridge, Lough Erne

The Ulster Canal is a disused canal running through part of County Armagh, County Tyrone and County Fermanagh in Northern Ireland and County Monaghan in the Republic of Ireland. In the early 19th century the idea of linking the lowlands around Lough Neagh with the Erne Basin and the River Shannon system became popular with the more progressive landowners and merchants of Armagh, Monaghan and Fermanagh. The Ulster Canal was built between 1825 and 1842 and was 74 km (46 mi) long with 26 locks. It ran from Charlemont on the River Blackwater to Wattle Bridge on the River Finn, south-east of Upper Lough Erne. It was an ill-considered venture, with the locks built narrower than the other Irish waterways, preventing through trade, and an inadequate water supply. It was an abject failure commercially, and contributed to the collapse of the Lagan Navigation Company, who took it over from the government but were then refused permission to abandon it when they could not afford the maintenance costs. It finally closed in 1931.

In 1778, a proposal was made for a canal from Ballyshannon to the Lower Lough Erne. The estimated cost of the scheme was £32,000, but it was already seen as part of a larger project, since a further £8,000 would have provided a link to Enniskillen, Belturbet and Ballyconnell. A future link from Ballyconnell to Ballymore, along the Woodford River valley, and on to Lough Scurr and the River Shannon at Leitrim was suggested but not costed. It would thus be an important section of a great waterway which was to cross Ireland from east to west, from Belfast to Limerick, which would compete with a similar link formed by the Grand Canal and the Royal Canal further to the south. Government funding was forthcoming in 1783, and a section of the canal was constructed between Ballyshannon and Belleek, with Richard Evans, the engineer for the Royal Canal, overseeing the work, which included a lock at Belleek. The project stalled in 1794, when funds ran out.


...
Wikipedia

...