US Highway 27 | ||||
---|---|---|---|---|
US 27 highlighted in red
|
||||
Route information | ||||
Maintained by MDOT | ||||
Length: | 218.195 mi (351.151 km) | |||
Existed: | November 26, 1926 | – April 16, 1999|||
History: | Signs were removed in 2002 | |||
Major junctions | ||||
South end: | I-69 / US 27 at Indiana state line | |||
US 12 near Coldwater |
||||
North end: | I-75 near Grayling | |||
Location | ||||
Counties: | Branch, Calhoun, Eaton, Clinton, Gratiot, Isabella, Clare, Roscommon, Crawford | |||
Highway system | ||||
|
Business US Highway 27 |
|
---|---|
Location: | Marshall |
Length: | 2.986 mi (4.806 km) |
Existed: | 1967–1972 |
Truck US Highway 27 |
|
---|---|
Location: | Lansing |
Length: | 1.529 mi (2.461 km) |
Existed: | c. 1936–1950 |
US 12 near Coldwater
I-94 in Marshall
I-96 near Lansing
I-69 / US 127 near East Lansing