Turin–Fossano–Savona railway | |
---|---|
Overview | |
Type | Heavy rail |
Status | in use |
Locale | Italy |
Termini |
Turin Savona |
Stations | 17 station, 6 stops |
Operation | |
Opened | 14 November 1823 7 February 1954 |
Owner | RFI |
Operator(s) | Trenitalia |
Technical | |
Line length | 153 km (95 mi) |
Number of tracks | 2 (Turin–Ceva) 1 (Ceva–Savona) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Operating speed | 160 km/h (99 mph) |
|