*** Welcome to piglix ***

Turin–Milan railway

Turin–Milan railway
Novara ferroviaTO-MI.jpg
The railway near Novara
Overview
Type Heavy rail
Status in use
Locale Italy
Termini Turin
Milan
Stations 18 station, 8 stops
Operation
Opened 1 July 1859 (1859-07-01)
Owner RFI
Operator(s) Trenitalia, Trenord
Technical
Line length 153 km (95 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 160 km/h (99 mph)
0.00 Torino Porta Nuova
to Pinerolo and Torre Pellice/Genoa
to Bardonecchia and France
6.00 Torino Porta Susa
Dora Riparia river
to Ceres (link closed in 2006)
8.00 Torino Dora
Stura di Lanzo river
12.00 Torino Stura
Milan-Turin Autostrada
Turin–Milan high-speed line
17.00 Settimo
to Pont Canavese
25.00 Brandizzo
Orco river
from Aosta
29.00 Chivasso
to Asti
32.00 Castelrosso
to Alessandria
36.00 Torrazza Piemonte
Dora Baltea river
40.00 Saluggia
43.00 Sant'Antonino di Saluggia
47.00 Livorno Ferraris
connection with Turin–Milan high-speed line
51.00 Bianzè
57.00 Tronzano
Autostrada A4/A26—European route E25
57.933 Santhià
to Biella and Arona
63.584 San Germano Vercellese
68.483 Olcenengo
from Casale Monferrato
77.054 Vercelli
Sesia river
to Pavia
82.051 Borgo Vercelli
Autostrada A26
88.937 Ponzana

...