Reporting mark | TNO |
---|---|
Locale | Texas and Louisiana |
Dates of operation | 1856–1961 |
Track gauge | 4 ft 8 1⁄2 in (1,435 mm) standard gauge |
Previous gauge | , 5 ft 6 in (1,676 mm) until 1876 |
Headquarters | Houston, Texas |
The Texas and New Orleans Railroad was a railroad in Texas and Louisiana. It operated 3,713 miles (5,975 km) of railroad in 1934; by 1961, 3,385 miles (5,448 km) remained when it merged with parent company Southern Pacific.
The Texas and New Orleans Railroad was chartered as the Sabine and Galveston Bay Railroad and Lumber Company in 1856, and was formed to build a railroad from Madison (now Orange) in Orange County to tidewater at Galveston Bay. Groundbreaking was on August 27, 1857 outside Houston and real construction work began in April, 1858. Shortly thereafter some work was transferred to Beaumont and railroad construction went east and west. By this time many people started to figure out the builders of the railroad wanted to see a railroad connecting Houston with New Orleans.
In the following year rails and equipment were ordered and received. By 1860 30 miles (48 km) of right-of-way was graded and 12 miles (19 km) of track was laid. In late 1859 the name of the railroad was changed to the Texas and New Orleans Railroad Company. By early 1861, track was laid for 80 miles (130 km) west of Beaumont and the trackage to Houston was complete.
In spring 1862 the President of the Railway, Abram M. Gentry, stated that the 110-mile (180 km) line from Houston to Orange was open, but some of the track was temporary for military needs due to the Civil War. Scheduled service was operated from Houston to Orange from 1862 to mid-1863 and irregular service until early 1864. Work on the line to Louisiana continued until New Orleans was captured.
The Trinity River Bridge washed out in 1867 and the Texas and New Orleans continued to offer service between Houston and Beaumont until spring 1868, at which time the company was forced into receivership. From 1870 to 1871 limited service operated between Houston and West Liberty until the railroad was sold. The purchaser was John F. Terry of the New York banking firm of J. S. Kennedy and Company. A new Texas and New Orleans Railroad company was chartered in 1874 and Terry was named President.
The first train from Houston to Orange in over a decade ran in late 1876. It was during this time the railroad was converted from broad gauge to standard gauge. In 1878 the Texas and New Orleans, Charles Morgan's Louisiana and Texas Railroad and Steamship Company, and the Louisiana Western Railroad Company reached an agreement and the line was finished from Orange to New Orleans. The Louisiana Western Extension Railroad Company was chartered in Texas to build from Orange to the Louisiana boundary and the first through train ran from Houston to New Orleans on August 30, 1880.