Country New Zealand
Location Te Uku, near Raglan
Coordinates 37°52′42″S 174°57′47″E / 37.87833°S 174.96306°E / -37.87833; 174.96306Coordinates: 37°52′42″S 174°57′47″E / 37.87833°S 174.96306°E / -37.87833; 174.96306
Status Operational
Construction began October 2010 (October 2010)
Commission date 19 November 2011 (19 November 2011)
Construction cost $230m
Owner(s) Meridian Energy and New Zealand
Wind farm
Type Onshore
Avg. site elevation 500m
Site area 200 hectares (2.0 km2)
Hub height 80 m (262 ft)
Rotor diameter 101 m (331 ft)
Rated wind speed 14–90 km/h (9–56 mph)
Power generation
Units operational 28
Make and model Siemens: SWT-2.3-101
Nameplate capacity 64 MW
Website
https://www.meridianenergy.co.nz/about-us/te-uku/

Te Uku Wind Farm is a wind farm at Te Uku near Raglan, New Zealand. It has a capacity of 64MW using 28 wind turbines. Construction was completed in March 2011, at a cost of $200 million. The farm covers an area of approximately 200 hectares (2.0 km2). The wind farm is jointly owned by WEL Networks and Meridian Energy.

Resource consent was granted in May 2008 and appeals were resolved by November 2008. Construction of the wind farm began in 2010. Hick Bros Civil and Spartan Construction won an award for outstanding technical and environmental planning. The wind farm was officially opened by the Prime Minister in February 2011. Te Uku was fully operational on 10 March 2011.

Te Uku Windfarm is controlled from Twizel.Twizel control centre was set up for the Waitaki power scheme.

The windfarm is linked to the national grid's Te Kowhai substation by about 17 km (11 mi) of 33kv lines on 159 steel poles built on concrete pile foundations and an underground cable from just west of Waitetuna Valley Rd to Cogswell Rd, a total of about 25 km (16 mi).

Each 130.5 m. high, 318 tonne, turbine took 2 or 3 days to build using 4 cranes, the largest a 600 tonne KR Wind/NZ Crane Group Alliance crane. Towers were formed in 3 sections (made in Korea), and topped by Siemens components (as at Makara) - a 3.5 m circumference, 81 tonne nacelle, hub and 3 turbine blades. Barge transport was considered, but rejected in favour of road transporters running from September 2010 to January 2011.

One of the mitigation measures was this walking and cycling track. The track climbs from a car park on Kawhia Rd, near Bridal Veil, runs about 6 km and climbs 280m to the windfarm on Wharauroa Plateau. Over 2 km of less interesting walking can be saved if the walk is started from the gate at the end of the driveable part of Plateau Rd. From this point Lake Disappear can be seen to the south after wet weather. There is no marked end to the track. It just peters out into the partly formed paper road (see the dashed line on the 1:50,000 map just north of the Pakihi Stream). It follows an ancient Maori track which was often used by warriors on raids between Waikato and Kawhia.


...