*** Welcome to piglix ***

Sungai Buloh-Serdang-Putrajaya MRT line

MRT Sungai Buloh–Serdang–Putrajaya Line
MRT Corp brand logo.png
MRT SSP Platform at Kwasa Damansara.jpg
MRT SSP Platform 3 at SBK04 Kwasa Damansara
Overview
Native name Laluan MRT Sungai Buloh–Serdang–Putrajaya
Type Rapid transit
System KVMRT Line 2 (MRT2)Cityflo 650 CBTC
Status Under construction
Termini Kwasa Damansara
Putrajaya Sentral
Stations 37
Services Sungai BulohKuala LumpurSerdangPutrajaya
Line number  12  Gold
Website mymrt.com.my
Operation
Planned opening Phase 1: July 2021; 4 years' time (2021-07)
Kwasa DamansaraKampung Batu
Phase 2: July 2022; 5 years' time (2022-07)
Kampung BatuPutrajaya Sentral
Owner Mass Rapid Transit Corporation (MRT Corp)
Conduction system Automated and driverless
Depot(s) Sungai Buloh Depot & Serdang Depot
Rolling stock 58 Hyundai Rotem four-car trains
Proposed rolling stock image 1
Proposed rolling stock image 2
Technical
Line length 52.2 km (32.4 mi)
Elevated: 38.75 km (24.08 mi)
Underground: 13.5 km (8.4 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 750 VDC
Route map
MRT Sungai Buloh-
Serdang-Putrajaya Line
to Kajang
SBK04 Kwasa DamansaraParking  9 
Sungai Buloh Depot
SBK03 RRI(future station)
SBK02 Kampung Selamat
SBK01 Sungai BulohParking KTM Intercity KTM ETS  2 
MRT1 Phase 1: operational
MRT2 Phase 1: opening 2021
S01 Damansara Damai
S02 Sri Damansara West
S03 Sri Damansara East
S04 Kepong SentralParking  2 
S05 Metro Prima
S06 Kepong Baru
S07 Jinjang Proposed transportation link to Selayang
S08 Sri Delima
S09 Kampung BatuParking  1 
MRT2 Phase 1: opening 2021
MRT2 Phase 2: opening 2022
S10 Kentonmen
Wikipedia

...