*** Welcome to piglix ***

Sungai Buloh-Kajang MRT Line

MRT Sungai Buloh-Kajang Line
"MRT operated by Rapid KL" exclusive branding for MRT Sungai Buloh-Kajang Line
MRT SBK Semantan Platform 1 viewing Kuala Lumpur city centre at the background.
A Siemens Inspiro EMU approaching SBK14 Semantan station.
Overview
Native name Laluan MRT Sungai Buloh-Kajang
Type Rapid transit
System KVMRT Line 1 (MRT1) - Cityflo 650 CBTC
Status Phase 1: Operational
Phase 2: Under construction
Termini Sungai Buloh
Kajang
Stations 31 + 3 reserved stations
Services Sungai BulohSemantan (Dec 2016)
Sungai Buloh - Kajang (Aug 2017)
Daily ridership 400,000 daily (expected)
Line number  9  (green)
Website myrapid.com.my
Operation
Planned opening Phase 2: 30 July 2017; 4 months' time (2017-07-30)
Semantan - Kajang
Opened Phase 1: 15 December 2016; 2 months ago (2016-12-15)
Sungai Buloh - Semantan
Owner Mass Rapid Transit Corporation Sdn Bhd
Operator(s) Rapid Rail Sdn Bhd (Prasarana Malaysia Berhad)
Conduction system Automated and driverless
Depot(s) Sungai Buloh Depot and Kajang Depot
Rolling stock Siemens Inspiro
58 four-car trainsets
Width: 3.1 m (10 ft)
Length: 89.56 m (293.8 ft)
Technical
Line length 51 km (32 mi)
Elevated: 41.5 km (25.8 mi)
Underground: 9.5 km (5.9 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Third rail, 750 VDC
Route map
MRT Sungai Buloh-Kajang Line
to Putrajaya
SBK01 Sungai BulohParking KTM Intercity KTM ETS  2 
SBK02 Kampung Selamat
SBK03 RRI(future station)
Sungai Buloh Depot
SBK04 Kwasa DamansaraParking  12 
SBK05 Kwasa SentralParking
SBK05A Teknologi
SBK06 Kota Damansara
SBK07 Surian
SBK08 Mutiara Damansara
SBK09 Bandar Utama  11 
SBK10 TTDI
SBK11 Phileo Damansara Parking
SBK12 Bukit Kiara(future station)  13 
SBK13 Pusat Bandar Damansara
SBK14 Semantan
Wikipedia

...