*** Welcome to piglix ***

St. Clair Tunnel

St. Clair Tunnel
St Clair River Tunnel - Port Huron Michigan.jpg
View of the original tunnel (closed in 1994) from a 1907 postcard
Overview
Official name Paul M. Tellier Tunnel (second tunnel)
Location St. Clair River between Port Huron, Michigan and Sarnia, Ontario
Coordinates 42°57′30″N 82°24′38″W / 42.95833°N 82.41056°W / 42.95833; -82.41056Coordinates: 42°57′30″N 82°24′38″W / 42.95833°N 82.41056°W / 42.95833; -82.41056
Operation
Opened 1891 (first tunnel)
1994 (second tunnel)
Closed 1994 (first tunnel)
Operator Canadian National Railway
Technical
Length 6,025 feet (1,836 m) (first tunnel)
6,129 feet (1,868 m) (second tunnel)
No. of tracks Single (each tunnel)
St. Clair Tunnel is located in Michigan
St. Clair Tunnel
Location on a map of Michigan
Designated October 15, 1970
Reference no. 70000684
Designated April 19, 1993
Built 1889
Architect Beach,Alfred; Hobson,Joseph
Governing body Private

The St. Clair Tunnel is the name for two separate rail tunnels which were built under the St. Clair River between Sarnia, Ontario and Port Huron, Michigan. It was the first full-size subaqueous tunnel built in North America. (By full-size it is meant that it allowed a railroad to run through it.)

The St. Clair Tunnel Company opened the first tunnel in 1891. The company was a subsidiary of the Grand Trunk Railway (GTR), which used the new route to connect with its subsidiary Chicago and Grand Trunk Railway, predecessor to the Grand Trunk Western Railroad (GTW). Before the tunnel's construction, Grand Trunk was forced to use time-consuming rail ferries to transfer cargo.

The tunnel was an engineering marvel in its day and designed by Joseph Hobson. The development of original techniques were achieved for excavating in a compressed air environment. The Beach tunnelling shield, designed by Alfred Ely Beach, was used to assist workmen in removing material from the route of the tunnel and left a continuous iron tube nearly 7,000 feet (2,100 m) long. Freight trains used the tunnel initially with the first passenger trains using it in 1892.

The tunnel measured 6,025 feet (1,836 m) from portal to portal. The actual width of the St. Clair River at this crossing is only 2,290 feet (698 m). The tube had a diameter of 19 feet 10 inches (6.05 m) and hosted a single standard gauge track. It was built at a cost of $2.7 million.


Steam locomotives were used in the early years to pull trains through the tunnel, however concerns about the potential dangers of suffocation should a train stall in the tunnel led to the installation of catenary wires for electric-powered locomotives by 1907. The first use of electric locomotives through the tunnel in regular service occurred on May 17, 1908. The locomotives were built by Baldwin-Westinghouse.


...
Wikipedia

...