*** Welcome to piglix ***

Springdale (Metro-North station)

Springdale
Springdale station, January 2011.jpg
Springdale station in January 2011
Location 886 Hope Street & 2 Clearview Avenue
Stamford, Connecticut
Coordinates 41°05′20″N 73°31′04″W / 41.0888°N 73.5178°W / 41.0888; -73.5178Coordinates: 41°05′20″N 73°31′04″W / 41.0888°N 73.5178°W / 41.0888; -73.5178
Line(s)
Platforms 1 side platform
Tracks 1
Connections CTTransit Stamford: 34
Construction
Disabled access Yes
Other information
Fare zone 31
History
Opened 1868
Rebuilt 1972
Electrified 12,500V (AC) overhead catenary
Services
Preceding station   MTA NYC logo.svg Metro-North Railroad   Following station
New Canaan Branch
toward New Canaan

The Springdale Metro-North Railroad station is located in Springdale section of Stamford, Connecticut along the New Canaan Branch of the New Haven Line.

The station is entirely on the west side of the single track of the New Canaan Branch and is between the Glenbrook and Talmadge Hill stations, 36.9 miles from Grand Central Terminal.

The Springdale station has a Plexiglas shelter (with a bench that seats eight) and a single side platform located on the west side of the track, allowing access to four railroad cars at once. The parking lot has landscaping and a "period pedestal clock".

The station has no ticket machine or staffed ticket office.

The Springdale station began as a stop on the New Canaan Railroad, which was chartered May 1866 as a short branch of the New York and New Haven Railroad. The line opened July 4, 1868. As with the rest of the New Haven Railroad, the station was acquired by Penn Central Railroad in 1969, and went bankrupt within the next year. Despite these problems, Springdale station was reconstructed 1/10 of a mile south of its previous location in 1972 in order to accommodate the new M-2 Cosmopolitan railcars. The station remains at the same location to this present day.

By 2010, after condominiums were built on nearby Camp Avenue, the station became more crowded.

In April 2010, construction started on a 400-foot, $1 million canopy on the station platform. Gar-San Corporation of Watertown won the $1.87 million contract for the project. (The company was to build an identical canopy at the Stratford train station.) A large part of the expense came from having the foundation for the canopy to be drilled into the ground because of space constraints, according to the state Department of Transportation (DOT). According to the DOT, construction was expected to be completed by the end of the year. In the meantime, 26 parking places were temporarily removed. Completion of the project was expected in December.


...
Wikipedia

...