*** Welcome to piglix ***

RapidKL railway system

Rapid Rail Sdn Bhd
Overview
Owner Prasarana Malaysia
Locale Klang Valley, Malaysia
Transit type Rapid transit
Number of lines Current:  3   4   5   8   9 
Future:  11 
Number of stations 116
Daily ridership 537,757 (2017)
(Increase 15.4%)
Annual ridership 196.281 million (2015)
Website myrapid.com.my
Operation
Began operation 16 December 1996; 20 years ago (1996-12-16)
Technical
System length 159.2 km (98.9 mi) (total)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
& ALWEG straddle-beam