Site of Special Scientific Interest | |
Area of Search | Somerset |
---|---|
Grid reference | SS880479 |
Coordinates | 51°13′09″N 3°36′18″W / 51.21928°N 3.60508°WCoordinates: 51°13′09″N 3°36′18″W / 51.21928°N 3.60508°W |
Interest | Biological |
Area | 186.3 hectares (1.863 km2; 0.719 sq mi) |
Notification | 1990 |
Natural England website |
Porlock Bay is on the Bristol Channel, between Hurlstone Point and Porlock Weir in Somerset, England.
The coastline includes shingle ridges, salt marshes and a submerged forest. In 1052 the Saxon king, Harold, landed at Porlock Bay from Ireland, and burnt the town before marching on London.
Much of the coastline is under the care of the National Trust, and the coastline forms part of the South West Coast Path.
Porlock Ridge and Saltmarsh (grid reference SS880479) is a 186.3 hectare (460.4 acre) biological Site of Special Scientific Interest on Porlock Bay, notified in 1990.
This site is notified for its nationally important active coastal geomorphological features. It is also nationally important for the salt marsh and coastal vegetated shingle habitats which occur here.
At Bossington a shingle beach, through which flows the River Horner, rising sea levels in the 1990s caused the creation of salt marshes and lagoons developed in the area behind the boulder bank.
This site comprises a shingle ridge and associated saltmarsh hinterland extending for a distance of approximately 4 kilometres along the west Somerset coast, immediately north of Porlock village. The type of geomorphological development seen at Porlock has been noted for coastal shingle systems elsewhere (e.g. west coast of Newfoundland, Canada). Although other UK systems probably developed and are developing in a similar manner, Porlock provides the only fully documented example of a nationally important coastal geomorphological system which has undergone catastrophic failure and subsequent evolution following sediment inhibition and a great storm in October 1996 which caused the single ridge to be breached allowing the marsh to be inundated with salt water at New Works (the drainage facilities for the previous managed fresh water marsh). This storm created a brand new tidal lagoon, which since that storm is rapidly developing with creeks forming and land that was recently farmed pasture now tidal salt marsh.