*** Welcome to piglix ***

Pioneer Village (TTC)

Pioneer Village
TTC - Line 1 - Yonge-University-Spadina line.svg
Location Steeles Avenue West,
Vaughan & Toronto, Ontario
Canada
Coordinates 43°46′39″N 79°30′41″W / 43.77750°N 79.51139°W / 43.77750; -79.51139Coordinates: 43°46′39″N 79°30′41″W / 43.77750°N 79.51139°W / 43.77750; -79.51139
Platforms Centre platform
Tracks 2
Bus operators BSicon BUS1.svg TTC
Connections BSicon BUS1.svgPioneer Village Terminal (York Region Transit)
Construction
Structure type Underground
Disabled access Yes
Architect Spadina Group Associates
Architectural style Postmodern architecture
Other information
Status Under construction
History
Opening Proposed for 2018
Services
Preceding station   TTC   Following station
toward Vaughan
TTC - Line 1 - Yonge-University-Spadina line.svg TYSSE
Pioneer Village Terminal
Location Steeles Avenue West,
Vaughan, Ontario
Canada
Coordinates 43°46′39″N 79°30′41″W / 43.77750°N 79.51139°W / 43.77750; -79.51139
Owned by Regional Municipality of York
Operated by York Region Transit
Platforms 5
Bus operators BSicon BUS1.svgYRT
Connections BSicon SUBWAY.svg TTC - Line 1 - Yonge-University-Spadina line.svg Pioneer Village subway station
Construction
Parking 1850 parking spaces.
Disabled access Yes
Other information
Fare zone 1
History
Opening 2017

Pioneer Village is a subway station under construction on the Yonge–University–Spadina line in Toronto, Ontario, Canada, and in Vaughan, Ontario, Canada, on its western branch, the Spadina line. It was originally planned to be a temporary terminus, with the line later extended further to Vaughan Metropolitan Centre; however, the entire extension is now set to open simultaneously. The station will be located on Steeles Avenue West at Northwest Gate.

The station was originally expected to be named Steeles West, but was renamed to Black Creek Pioneer Village on September 28, 2012 for Black Creek Pioneer Village. On July 24, 2013, the unbuilt station was renamed once more, shortening it to Pioneer Village.

The major buildings of York University's main Keele Campus lie to the southeast of the proposed location. Black Creek Pioneer Village, Canlan Ice Sports and Aviva Centre are found to the southwest, and the Toronto Track and Field Centre to the east.

The station will be built underground, lying on a northwest-southeast axis. The line will approach from York University station northwestward, directly under the university's main buildings, to meet the station. Construction may require the removal of the parking lot at Northwest Gate and use of vacant land next to the United Parcel Service centre in Vaughan.


...
Wikipedia

...