*** Welcome to piglix ***

Oxford Parkway railway station

Oxford Parkway National Rail
Oxford Parkway railway station.JPG
Location
Place Water Eaton
Local authority Cherwell
Coordinates 51°48′15″N 1°16′28″W / 51.8042°N 1.2745°W / 51.8042; -1.2745Coordinates: 51°48′15″N 1°16′28″W / 51.8042°N 1.2745°W / 51.8042; -1.2745
Grid reference SP501119
Operations
Station code OXP
Managed by Chiltern Railways
Owned by Network Rail
Number of platforms 2
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2015/16 0.275 million
History
Original company Network Rail
25 October 2015 Opened
National RailUK railway stations
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Oxford Parkway from Office of Rail and Road statistics. Methodology may vary year on year.
170433 at Edinburgh Waverley.JPG

Oxford Parkway railway station is a railway station at Water Eaton, Oxfordshire, on the railway line between Oxford and Islip. Full regular weekday service began on Monday 26 October 2015, although the first passengers travelled the previous day on a Sunday timetable.

The station, whose name was changed in September 2013 from the provisional "Water Eaton Parkway", lies between Kidlington and Oxford beside the existing Water Eaton park-and-ride site. It serves Kidlington, north Oxford and nearby villages. The station forms part of a multi-modal transport interchange node, connecting travellers by bus, cycle, on foot and by car with rail transport. It is also intended to attract park-and-ride traffic from the busy A34, A40 and A44 roads.

Services to Oxford started on 11 December 2016.

The station is part of Project Evergreen 3, funded and managed by Chiltern Railways. It is served every half-hour by trains from London Marylebone. Chiltern Railways opened the station in October 2015 for trains towards Bicester and London Marylebone, with services to Oxford railway station beginning in December 2016, delayed from Spring 2016 as locals objected to the extra noise that would be caused. The journey time to London is about an hour. Network Rail completed the final track upgrades on this portion of the route in September 2016 allowing driver training runs on the line ahead of the inauguration of new services on 11 December.

The East West Rail Consortium's planned rail service between Oxford and Milton Keynes Central and Bedford Midland will also serve Oxford Parkway.


...
Wikipedia

...