Oskarshamn Nuclear Power Plant | |
---|---|
Oskarshamn NPP
|
|
Country | Sweden |
Coordinates | 57°24′56″N 16°40′16″E / 57.41556°N 16.67111°ECoordinates: 57°24′56″N 16°40′16″E / 57.41556°N 16.67111°E |
Construction began | 1965 |
Commission date | O1: February 6, 1972 O2: January 1, 1975 O3: August 15, 1985 |
Operator(s) |
OKG Aktiebolag (E.ON 54.5%, Fortum 45.5%) |
Nuclear power station | |
Cooling source | Kalmar Strait |
Cooling towers | no |
Power generation | |
Units operational |
1 × 494 MWe 1 × 664 MWe 1 × 1,450 MWe |
Capacity factor | 68.9% |
Annual gross output | 15,736 GWh |
The Nuclear power station Oskarshamn is one of three active nuclear power stations in Sweden. The plant is about 30 kilometers (19 mi) north of Oskarshamn, directly at the Kalmarsund at the Baltic Sea coast and with three reactors producing about 10% of the electricity needs of Sweden. All reactors use BWR technology.
Unit 1 has an installed output of 494 MW, Unit 2 664 MW, and Unit 3, the newest reactor block at the facility, has an installed output of 1,450 MW. The nuclear power station Oskarshamn is thereby one of the largest power stations in the Nordic area by production.
Clab, the temporary storage facility for spent nuclear fuel from all Swedish reactors, is also located at the site.
The responsible utility is OKG, short for the Oskarshamnsverkets Kraftgrupp OKG, which was acquired by Sydkraft in 1993, which is called E.ON Sverige currently. E.ON Sverige owns 54.5% and the other partner Fortum 45.5% of OKG.
On July 25, 2006, Units 1 and 2 were shut down as a precaution after a safety-related incident at an identical reactor at the Forsmark plant. The incident related to a failure of diesel generators to automatically start up when required, after a blackout caused by a shortcut at the grindgear sections at the plant. Modifications were later made to all the plants to address the issue.
On May 21, 2008, a welder was caught on the entrance security check with trace elements of explosives on a carrier bag and his hand. The same evening Reactor 1 of the facility was shut down to allow bomb teams to sweep the facility. With police investigations ongoing, Kalmar police spokesperson Sven-Erik Karlsson confirmed to the TT news agency that a welder on his way in to the plant on Wednesday morning was caught with a relatively small amount of a highly explosive substance. The substance was later shown to be from nail polish and the event had no relevance to the operation of the plant or nuclear safety.
Unit 2 is currently undergoing power and security upgrades. Unit 3 is after many upgrades the most powerful BWR in the world at approximately 1450 MWe. Due to the upgrade, the reactor has been on and off the grid with prolonged maintenance outages throughout 2010. Unit 2 will be upgraded in several steps and will reach maximum capacity of thermal power 2,300 MW and 840 MWe in 2011.