*** Welcome to piglix ***

Neudietendorf–Ritschenhausen railway

Neudietendorf–Ritschenhausen
Karte-Strecke-Erfurt-Schweinfurt.png
Overview
Locale Thuringia, Germany
Line number 6298
Technical
Line length 75 km (47 mi)
Number of tracks 2: Neudietendorf–Plaue (Thür)
Gehlberg–Oberhof (Thür)
Operating speed 160 km/h (99 mph) (max)
Route number 570
Route map
 Operating points and lines 
from Erfurt Hbf
0.00 Neudietendorf 248.54 m
to Eisenach
3.40 Sülzenbrücken 255.48 m
5.69 Haarhausen 265.57 m
"Erfurter Kreuz" industrial area
9.94 Arnstadt Hbf 279.17 m
to Ichtershausen
to Saalfeld
11.31 Arnstadt Süd 281.40 m
12.18 Block Lohmühle
15.00 Block Siegelbach
18.17 Plaue (Thür) 331.08 m
to Ilmenau
24.17 Gräfenroda 380.58 m
to Gotha
27.97 Dörrbergex Block 446.04 m
30.33 Tunnel am Zwang (104.5 m) 493.00 m
12.30 Block Kehltal
35.58 Gehlberg 598.44 m
36.85 Brandleite Tunnel (3039 m) 621.44 m
39.89
40.06 Oberhof (Thür) 640,05 m
45.45 Zella-Mehlis 543.30 m
to Wernshausen
45.94 Zella Tunnel (233 m) 539.20 m
48.10 Block Struth
Suhl city viaduct
51.68 Suhl 427.61 m
to Schleusingen
55.11 Suhl-Heinrichs(Suhl-Heinrichswerk) 395.45 m
56 Mäbendorf
58.20 Dietzhausen 374,48 m
64.86 Rohr (Thür)ex Bf 330.59 m
from Eisfeld
71.64 Grimmenthal 301,90 m
to Meiningen
from Meiningen
74.98 Ritschenhausen 314.61 m
to Schweinfurt

...
Wikipedia

...